Northlake 635(7)-LR 980422 ENGINEERING, LXC.
8901 Carpenter Fr~vy., Suite #100
Dallas, Texas 75247
Date of Service: 04,.'13/1998 Report No.: 9809639 Report Date
t t
04;22~ 1998
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, Inc. Project: Calling Center
Attn: David Glass Coppell, Texas COPy
3890 W. N.W. Hx~3', Suite 400
Dallas TX 75220
Services: Snructural steel 4-=~=~i ....
On nkis dane, an HOC Engineering rez. resentative arrived ar 5ke above referenced
jobsite as schedule~ to ~erfcrm in, section cn framing from Grids ~ tc 3 and no
i~. The following isems have been visually insc. ecse~ cn this da~e.
'. Column anchcr bolts: See dev~a5ion shees, isem ~!.
2. Joisr ~c =oisn girder ,[Reference ~erail CO/s3.~), wel~s comply afser
correcsions were made for missed wel~s.
3. 3oist girder to column cad (P. eference desail Cf/SO.i), wel~s comply.
4 Joist ~ tc panel sonnecsion (Reference detail 36,'"S3 ~', welds ccmply
5. Joist nc panel connections (S. eference A..."E2), Random inspection revealed
.
~m.~ are in compliance
6. Bri~ging: See deviation sheen, item ~2.
Technician: Larry Peel ~ Engineering, Inc.
Report Distribution:
(1) Premiss Properties Limited, Inc. ( l ) l lalff Associates, Inc.
( l ) Butler Construction ( I ) City- of CoppeH Paul D. Smith, P.E.
(1) Alliance Architects, Inc. ( 1 ) HCBeck Conn'actors Senior Project Engineer
(l) Brockette Davis Drake, Inc. (1) City of Coppel[
This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in full without the x~-xitten approval of IIBC Engineering, Inc.
99MP Page 1 of I