Northlake 635(9)-CS 961125The City With A Beautiful Future
James M. Corkill, FAI-IA/AIA
The Richmond Group
12200 Stemmons Fwy., Suite 207
Dallas, TX 75234
(~ P.O. Box 478
Coppell, Texas 75019
214-462-0022
N
Northlake 635 Business Park, Lot 3, Block C (Marek Brothers Sysl
Development Fee Assessment
,vember 25, 1996
ems, Inc.)
Dear Mr Corkill:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, al,
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $14,700.00 and
Finance Department along with a copy of the Fee Assessment table. This amou
of the assessed fees which need to be paid prior to Council approval. Please re/
table for additional fees. Also provide a copy of the Engineer's estimate or con~
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help u: to verify the
payment of required fees and insure a successful beginning of this project. We ~ok forward
to working with you on this project. If you have any questions, please contact ~.
Sin?ergly,
Asfistant Ci¢3~[anager/City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
)ng witha copy
forward to the
at is a portion
er to attached
xact to our office
DEVELOPMENT FEE TABLE
Project: Northlake 635 Business Park, Lot3, Block C (Marek Brothers Syste~, Inc.)
Date: 11/25/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $134.93
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,487.38
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $7,950.00 $7,950.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $16,672.31
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $14,700.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Northlake 635 Business Park, Lot3, Block C (Marek Brothers Systen
DATE: 11/25/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
I -1 1/2 inch = 5
1 - 1 inch = 2.5
I - 6 inch = 2.5
Total 8: 10 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total 8: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total 8: 1 Domestic Meter(s) @ $134.93
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total 8: 1 Irrigation Meter(s) @
Total 8: 0 Additional Irrigation Meter(s) @
Total 8: 1 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$48.3O
$1,439.08
Water Meter Deposit Fee (Domestic):
Total 8: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 8: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page I
Inc.)
ESU's
ESU's
ESU's
ESU's
$4,500.00
$150.00
$134.93
$48.30
$0.00
$1,439.08
$30.00
$70.00
$2,250.00
$50.00
$50.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
{50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
N/A
N/A
N/A
N/A
N/A
N/A
$7,950.00
Information not
available at this time
Information not
available at this tia¢
Need submittal of
development contracts
ROADWAY IMPACT FEE CALCULATIONS
Northlake 635 Business Park, Lot $, Block C (Marek Brothers Systems,
11/25/96
PROJECT:
DATE:
ROADWAY IMPACT FEE:
Service Area *
Category **
l.and Use **
Building Si~e (ScI. Ft.)
Development Units **
Vehicle Miles per Development Unit **
:ce per Vehicle Mile ***
[oadway Impact Fee due = (Development Units) x
(Vehicle Miles per Develop_ment Uni0 x (Fee per Vehicle Mile) --
10
Indust
General Linch!
25,0(
Inc.)
iai
25
1.0/
$30(
* (Figure 2 - Roadway Impact'.
** (Table 3 - Roadway Impact F
*** (Schedule 2, Page 3 - Roadw.
This fee is eligible for up to a 50 % credit do to the
original developer constructing Lakeshore & Crestsid~
To Receive this credit a letter from the original derek
needs to be submitted assigning some of the credits fo
this development.
$7/950.00
?ce Study)
ee Study)
ty Impact Fee Study)
Drives.
~r