Loading...
Northlake 635(7)-LR 980409CONCRETE CoMpRL.'_SIVE STRENGTH TEE-__ ENGLNEERKqG, INC. 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 03..:05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc.3890Atrn: w.David N.w.Glass H~3~, Suite 400 Project: Calling Center Coppell, Texas ' ~OPY Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPI,1ER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 aATC. TIME: 3:55 am PLANT: 19 TI.ME SAMPLED: 4:40 am BY: Jimmy Amip SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, cloudy STRENGTH: 4000 psi 6- 28 Days TE.~IeERATCRE(V)-AIR 60 F CONCRETE: 68 F SLUMP: 5" TRUCK NO: 769 'rlCKET NO: 628681 AIR: N/A AIR CONTENT (%): N/A t'XIT V*'EIGHT (peO: TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: ASTM C- 172 Slab-on-grade, center, 4-7, A-J ASTM C-39 SAMPLE LOCATION: 6;I.5 REPORT OF TESTS ACCUMULATIVE YARDS: 70 CYI.INDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 03/12.," 1998 7 95760 3390 1 2 5.00 03/12/1998 7 97380 3440 Average 3420 1 3 5.00 04.'02/1998 28 151560 5360 1 4 5.00 04/02/1998 28 141920 5020 Average 5190 This report ts exclusively for the use of the client indicated above and shall not be reproduced except in :',,11 without the written approval of HBC Engineering, Inc. 01AK Page 1 of 8 CONCRETE COMPRI . SIVE STRENGTH TES_ ENGLNEERING, LNC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Sen'ice: 03/05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 ...... "OPY Client: Prentiss Properties Limited, Inc. Project: Calling Center -,,~4~' Attn: David Glass Coppell, Texas 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 BATCH T1ME: 4:52 am PLANT: 19 TIME SAMPLED: 5:40 am BY: Jimmy At-nip SPECIFICATION REQL'IREMENTS WEATHER CONDITIONS: Cool, cloudy STRENGTH: 4000 psi ~ 28 Days TEMI'ERATURE (E)- AIR 62 F CONCRETE: 66 E SLL'MP: 5" TRUCK NO: 763 TICKET NO: 628689 AIR: N/.Ax AIR CONTENT (%): N/A UNIT WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 6.5/H REPORT OF TESTS ACCUMULATIVEYARI)S: 150 CYI,INDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FR, a, CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 ! 5.00 03/12/1998 7 103960 3680 2 2 5.00 03/12/1998 7 105250 3720 Average 3700 2 3 5.00 04..'"02/1998 28 144580 5110 2 4 5.00 04/02/1998 28 137390 4860 Average 4990 This report is exclusively for the use of the client indicated abo~e and shall not be reproduced except in full without the ~vritten approval of HDC Engineering, Inc. 01AK Page 2 of 8 ENGR~TzERING, ~C. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-247%97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY Att-a: David Glass Coppell, Texas 3890 W. N.W. Hx~-T, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 BATCH TI_ME: 7:15 am PI.ANT: 19 TIME SAMPLED: 8:00 am BY: Jimmy Amip SPECIFICATION' REQUIREMENTS WEATHER CONDITIONS: Cool, cloudy STRENGTH: 4000 psi ~. 28 Days TEMPERATL'RE (F)-.4,1R 60 F CONCRETE: 68 V SLUMP: 5" TRUCK NO: 408 TICKET NO: 628712 AIR: N:"A AIR CONTENT (%): N/'A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACE MENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 4.5."I REPORT OF TESTS ACCt,.~-IC~-ATIVE YARDS.' 260 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SIA.;MP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 6.00 03./12/1998 7 89800 3180 3 2 6.00 03/12/1998 7 92250 3260 AYerage 3220 3 3 6.00 04.."02/1998 28 122950 4350 3 4 6.00 04/02/1998 28 l 17890 4170 Average 4260 This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval of IIBC Engineering, Inc. 01AK Page 3 of 8 CONCRETE COMPRI_ .SIVE STRENGTH TES_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/05...'1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: erentissAttn: DavidPr°pertiesGlass Limited, Inc. Project: Callingcoppell.CenterTexas 3890 W. N.W. H~-~', Suite 400 ' Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 aATCH TreE: 8:30 am PLANT: 19 TIMESA,XIPLED: 9:15 am BY: JimmyAtnip SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool, cloudy STRENGTH: 4000 psi ~¢ 28 Days TEMPERATURE (F)- AIR 58 F CONCRETE: 68 F SLUMP: 5" TRUCK NO: 852 TICKET NO: 651783 AIR: N/A .AIR CONTENT (%): N/A UNIT WEIGHT (per): N/A TEST METHOD: ASTM C- 143 PI.ACEMENT LOCATION: See page I ASTM C-172 ASTM C-39 SAMPLE I.OCATION: 4.5/H REPORT OF TESTS ACCt:MULATIVEVARDS: 360 CYI.INDER MEASURED .M.,MXIM U M COMPRESSIVE MARKED SLUMP DATE AGE I.OAI) STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 5.00 03/12/1998 7 98250 3470 4 2 5.00 03.'"'12/1998 7 92250 3260 Average 3370 4 3 5.00 04,'"02/1998 28 124150 4390 4 4 5.00 04.."02/1998 28 115060 4070 Average 4230 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of IIBC Engineering, Inc. 01AK Page 4 of 8 CONCRETE COMPRL-. SIVE STRENGTH TES-_ ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center -.;"a'~attaa~l~l~,~ ,~ Attn: David Glass Coppell, Texas '-.~'~ 3890 W. N.W. Hw3,, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 BATCH TIME: 9:58 am PI. ANT: 19 TIMESAMPI.ED: 11:15 am BY: Jimmy Atnip SPECIFICATION REQL'IREMENTS WEATHER CONDITIONS: Cool, cloudy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)-.AIR 62 F CONCRETE: 68 F SLL'MP: 5" TRI_'CK NO: 554 TICKET NO: 628744 AIR: N/A AIR CONTENT (%): N/'A UNIT WEIGHT (prO: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: E/5.5 REPORT OF TESTS ACCUMULATIVEVARVS: 440 CYLINDER MEASURED MAXIMUM COMPRESSIVE .MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 5 I 5.00 03/12/1998 7 1 11780 3950 5 2 5.00 03/12/1998 7 102390 3620 Average 3790 5 3 5.00 04/02/1998 28 140260 4960 5 4 5.00 04/02/1998 28 127780 4520 Average 4740 l'h~s report is exclusively lbr the use of the client indicated above and shall not be reproduced except in lull without the written approval of HBC Engineering, Inc. 01AK Page $ of 8 CONCRETE COMPRL._,SIVE STRENGTH TES_ ENGLNEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 03/05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 "' 3PY Client: Prentiss Properties Limited, Inc. Project: Calling Center .' Attn: DavidGlass Coppell, Texas 3890 W. N.W. H~', Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SL'PPLIER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 hATCH TIME: 11:40 am PLANT: 19 TrME SAMPLED: 12:30 pm nY: Jimmy Atnip SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Coo1, clear STRENGTH: 4000 psi ~ 28 Days TEMPEILATURE (F)-AIR 62 r CONCRETE: 68 F SLUMP: 5" TRUCK NO: 845 TICKET NO: 629263 .aiR: N/A aiR CONTENT (%): N/A UNIT WEIGnT (per}: N/A TEST METHOD: ASTM C- 143 PLACEMENT I.OCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 5-"C. 8 REPORT OF TESTS ACCUMULATIVE YARDS: 530 CYLINDER MEASL'RED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE I.OAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 6 I 5.25 03/'12/1998 7 107580 3800 6 2 5.25 03.."12/1998 7 111160 3930 Average 3870 6 3 5.25 04..'02/1998 28 138950 4910 6 4 5.25 04;02/1998 28 136540 4830 Average 4870 This report is exclusively for the use of the client indicated abox c and shall not be reproduced except in full without the ~Titten approval of llBC Engineering, Inc. 01AK Page 6 of 8 CONCRETE COMPRI _,SIVE STRENGTH TES. ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 DaLlas, Texas 75247 Date of Service: 03/05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center ~ O p~:..-~" Attn: David Glass Coppell, Texas 3890 W. N.W. Hr,?, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CON'CRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENTVATE: 03/05/1998 BATCHTIME: 1:16 pm PLANT: 19 TI.XlE SAMPLED: 1'50 pm BY: Jimmy Atnip SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, windy STRENGTH: 4000 psi ~'. 28 Days TEMPERATURE (F)- AIR 64 F CONCRETE: 68 F SLUMP: 5" TRUCK NO: 512 TICKET NO: 65 1853 AIR: N/A aiR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEblENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SANIPLE LOCATION: B.5/6.5 REPORT OF TESTS ACCUMULATIVE YARDS: 640 CYLINDER MEASURED MAXIMt:M COMPRESSIVE MARKED SLUMP DATE AGE I.OAI) STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 7 I 5.00 03/12/1998 7 125680 4440 7 2 5.00 03/12/1998 7 121650 4300 Average 4370 7 3 5.00 04/02/1998 28 146960 5200 7 4 5.00 04/02/1998 28 145320 5140 Average 5170 This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the xwitten approval of HBC Engineering, Inc. 01AK Page 7 of 8 CONCRETE COMPRL ,SIVE STRENGTH TEl,. ENGINEERING, INC. 8901 Carpenter Frwy., Suite gl00 Dallas, Texas 75247 Date of Service: 03/05/1998 Report No.: 9806549 Report Date 04/09/1998 Client No.: 71765000 Project No.: 43-2479-97 ;" OPY Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell, Texas 3890 W. N.W. H~W, Suite 400 Dallas TX 75220 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Butler Construction CONCRETE CLASS: 9349 CONCRETE SUPPLIER: Pioneer Concrete PLACEMENT DATE: 03/05/1998 BATCHTIME: N,;A PLANT: 19 TI.TIE SA.XtPLED: 3:40 pm BY: Jimmy Atnip SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear, windy STRENGTH: 4000 psi ~ 28 Days TEMPERATURE (F)- AIR 59 F CONCRETE: 68 F SIA'MP: 5" TRUCKNO: 554 TICKETNO: 629298 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: A.5/6.5 REPORT OF TESTS ACCUMULATIVE YAROS: 720 CVI. INDER ~Ir.^SI:RED .~IAXmrM CO.~IeRESSlVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 8 1 5,00 03/12/1998 7 117960 4170 8 2 5.00 03/12/1998 7 118840 4200 Average 4190 8 3 5.00 04/02/1998 28 146350 5180 8 4 5.00 04.,02; 199o 28 133720 4730 Average 4960 Technician: Jimmy At-nip Started: 3:00 am Finished: 5:00 pm m~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) HalffAssocia:es, Inc. (1) Butler Construction ( I ) City of Coppcil Eugene Harbour (1) Alliance Architects, Inc. (1) EverffButler Const. Vice President (1) Brockette Davis Drake, Inc. (1) HBC Engineering; Mr. Eugene l tarbour This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01AK Page 8 of 8