Loading...
Northlake 635(7)-LR 980305 ENGINEERING, IN'C. 8901 Carpenter Frwy., Suite/Il00 Dallas, Texas 75247 Date of Service: 02/27/1998 Report No.: 9806148 Report Date 03/05/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell, Texas 3890 W. N.W. Hx~-~y, Suite 400 Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Gray limestone 16.0 111.5 -2/+2% 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pc0 (% max) Sanitary Line on S End 400 40' west of east end, Final lift 1 17.3 109.9 99 401 40' west of east end, 1' down 1 17.5 110.3 99 402 80' west of east end, Final lift 1 16.9 109.2 98 403 80' west of east end, 1' down 1 16.7 109.7 98 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited. Inc. (1) l lalff Assocm:es, Inc. ( 1 ) Butler Construction { 1 ) City of Coppell Paul D. Smith, P.E. {I) Alliance Architects, Inc. (1) l tCB¢ck Contractors Senior Project Engineer (1) Brockctte Davis Drake, Inc. (1'~ Cily of Coppe!l This report is exclusively for thc use of the client indicated abovc and shall not be :-eproducee except in full without the written approval of HBC Engineering, Inc. 07 Page I of 1