Loading...
Northlake 635(7)-LR 980127IN-PLACE DENSITY 2 STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/02/1998 Report No.: 9801102 Report Date 01/09/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell, Texas GOPY 3890 W. N.W. Hw.w, Suite 400 Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction Laboratory Test .Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description .Moisture % Density pcf .Moisture Density I Gray limestone 16.0 111.5 Opt. or above 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pet) (% max) 351 NE comer 40' south & 60' west, Final lift 1 16.2 108.0 97 352 NE comer 40' south & 125' west, Final lift 1 16.4 107.8 97 353 NE comer 40' south & 200' west, Final lift I 16.1 108.0 97 354 NE comer 40' south & 280' west, Final lift 1 16.6 106.4 95 355 NE comer 40' south & 370' west, Final lift 1 16.0 108.8 98 356 NE comer 95' south & 400' west, Final lift 1 16.2 108.0 97 357 NE comer 95' south & 300' west, Final lift 1 16.6 107.6 97 358 NE comer, 95' south & 200' west, Final lift 1 16.3 107.8 97 359 NE comer, 95' south & 100' west, Final lift 1 16.4 107.5 96 360 NE comer, 95' south & 20' west, Final lift 1 16.1 108.2 97 361 NE comer, 120' south & 50' west, Final lift 1 16.4 109.2 98 362 NE comer, 120' south & 120' west, Final lift 1 16.9 108.8 98 363 NE comer, 120' south & 200' west, Final lift 1 17.0 108.9 98 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of ItBC Engineering, Inc. Page I of 2