Northlake 635(7)-LR 980114IN-PLACE, DENSITY 5__,STING
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #100
Dallas. Texas 75247
Date of Service: 01/03;'1998 Report No.: 9801154 Report Date
01/14/1998
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY
Attn: David Glass Coppell, Texas
3890 gr. N.W. Hx~3', Suite 400
Dallas TX 75220
Services: In-place density testing.
PROJECT DATA
CONTRACTOR: Butler Construction
I.aboratory lest Method: ASTM D-698
Field Test Method: ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Processed ~ay limestone 16.0 111.5 Opt. or above 95%
FIELD DENSITY TESTS
TEST M/D MOISTURE DRY DENSITY DENSITY
NO TEST LOCATION No. (%) (pet) (% max)
371 SE comer. 50' north & 30' west, Final lift 1 16.3 110.3 99
372 SE comer. 50' north & 100' west, Final lift 1 16.9 109.2 98
373 SE comer. 50' north & 200' west, Final lift 1 16.3 109.8 99
374 SE comer. 50' north & 300' west, Final lift 1 16.7 109.4 98
375 SE comer. 50' north & 400' west, Final lift 1 16.5 109.2 98
376 SE comer. 95' north & 400' west, Final lift 1 17.1 108.5 97
377 SE comer. 95' north & 300' west, Final lift 1 17.0 108.6 97
378 SE comer, 95' north & 200' west, Final lift 1 16.7 108.9 98
379 SE comer, 95' north & 100' west, Final lift 1 16.9 108.4 97
380 SE comer, 95' north & 60' west, Final lilt 1 17.2 108.8 98
Test results on this report meet project specification.
Technician: Tex King ~ Engineering, Inc.
Report Distribution:
(1) Prentiss Properties Limited, Inc. (1) I lalff Associates, Inc.
(1) Butler Construction (1) City of Coppell Paul D. Smith, P.E.
(1) Alliance Architects, Inc. (1) I ICBcck Comractors Senior Project Engineer
( 1 ) Brockette Davis Drake, Inc. (1) City of Coppcll
This report is exclusively for the usc of the client indicated abo; e and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07 Page I of 1