Loading...
Northlake 635(7)-LR 980114IN-PLACE, DENSITY 5__,STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: 01/03;'1998 Report No.: 9801154 Report Date 01/14/1998 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY Attn: David Glass Coppell, Texas 3890 gr. N.W. Hx~3', Suite 400 Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction I.aboratory lest Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Processed ~ay limestone 16.0 111.5 Opt. or above 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pet) (% max) 371 SE comer. 50' north & 30' west, Final lift 1 16.3 110.3 99 372 SE comer. 50' north & 100' west, Final lift 1 16.9 109.2 98 373 SE comer. 50' north & 200' west, Final lift 1 16.3 109.8 99 374 SE comer. 50' north & 300' west, Final lift 1 16.7 109.4 98 375 SE comer. 50' north & 400' west, Final lift 1 16.5 109.2 98 376 SE comer. 95' north & 400' west, Final lift 1 17.1 108.5 97 377 SE comer. 95' north & 300' west, Final lift 1 17.0 108.6 97 378 SE comer, 95' north & 200' west, Final lift 1 16.7 108.9 98 379 SE comer, 95' north & 100' west, Final lift 1 16.9 108.4 97 380 SE comer, 95' north & 60' west, Final lilt 1 17.2 108.8 98 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) I lalff Associates, Inc. (1) Butler Construction (1) City of Coppell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) I ICBcck Comractors Senior Project Engineer ( 1 ) Brockette Davis Drake, Inc. (1) City of Coppcll This report is exclusively for the usc of the client indicated abo; e and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07 Page I of 1