Loading...
Northlake 635(9)-LR 970328Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: East side of paving on south side of bldg. Cylind approx. 60' west of Lakeshore Dr. and 30' north East side of paving on south side of bldg. Cylinde approx. 15' west of Lakeshore Dr. and 10' south SAMPLE DATA: SET 1 SET 2 MIX NO. 9351 Truck No. 396 731 Cement 470 Type I Ticket No. 343376 343387 Flyash Time Batched 10:47am 12:15pm Sand 1307 Time Sampled 11:20am 12:45pm in. Concrete Temp. (ASTM C1064) 72°F 75°F 1.0 in. 1840 Air Content (ASTM C231) 6.1% 5.8% Water 262 Unit Weight {ASTM C138) Admix //1 WRDA 79 @ Admix //2 AEA Darex II @ 3J COMPRESSIVESTREN, GTH.~T.F-,S.T$,{~ST~ c3m (Standard 6 inch x 1 2 Cylinder slum~ L~'r'~A~Z;L";C:~;?Te~{~' q"=' Total [6ad Compres~v Number Inches ~'~ ';n~:'~:~:~' ~te::,~ ::, Pounds Streng~ :~.~;~:.~,~. ~ ~STMC~'43)~.~ ~:~ .......... ,~"~ ~' -* ~," ,'~ ' psi :'i:04 105 106 107 6.00"*': 7 04/04/97 82,600 2920 6.00 28 04/25/97 113,300 4010 6.00 28 04/25/97 113,000 4000 6.00 56 05/23/97 28-Day Average 4010 04/04/97 92,000 3250 04/25/97 116,400 4120 04/25/97 114,900 4060 05/23/97 108 109 110 111 5.50 7 5.50 28 5.50 28 5.50 56 28-Day Average 4090 *No water added on jobsite. Sampled going into pump. TECHNICIAN: DISTRIBUTION: RDG (%) Stanley Construction Co., LLP, Lloyd A. White (~): RichmOnd Group, Jim Corkhill (~') T.A.S, Construction, Inc., James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 's, Inc. t6.1081 !8 March 1997 'ioneer rs taken from )f south curb. rs taken from 3f north curb. 15.5 oz/yd oz/yd ch cylinder) 4000 4000 Fax (214) 351-5148