Loading...
Northlake 635(9)-LR 970328 (3)Hooper Engineering Laboratorie;s, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell SUPPLIER: East side of paving on south side of bldg. Cylind approx. 60' west of Lakeshore Dr. and 30' north East side of paving on south side of bldg. Cylindt approx. 15' west of Lakeshore Dr. and 10' south SAMPLE DATA: SET 1 SET 2 MIX NO. 9351 Truck No. 396 731 Cement 470 Type I Ticket No. 343376 343387 Flyash Time Batched 10:47am 12:15pm Sand 1307 Time Sampled 11:20am 12:45pm in. Concrete Temp. (ASTM ClOe4) 72°F 75°F 1.0 in. 1840 Air Content {ASTM C231) 6.1% 5.8% Water 262 Unit Weight {ASTM C138) Admix #1 WRDA 79 @ Admix #2 AEA Darex II @ 3J COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 Cylinder Slump Age i ': * Test Total Load · CompressN Number Inches ·'.' DaYs : ~ ~ rDate ' ,' Pounds ' Strength iAsTM C143) psi 104 6,00° 7 04/04/97 105 6,00 28 04/25/97 106 6,00 28 04/25/97 107 6,00 56 05/23/97 108 5.50 7 04~04~97 109 5,50 28 04/25/97 110 5,50 28 04/25/97 111 5,50 56 05/23/97 )6,1081 Z8 March 1997 3ioneer ~rs taken from 3f south curb, ~rs taken from of north curb, *No water added on jobsite. TECHNICIAN: DISTRIBUTION: Sampled going RDG 82,600 2920 28-Day Average 92,000 3250 28-Day Average into pump. (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill {1) T.A.S. Construction, Inc., James Myers (1) Ciw of Coppell, Larry Davis 5.5 oz/yd oz/yd c,f'linder)..:~ .~,, , Required 28'Day Strength 4000 4000 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148