Loading...
Northlake 635(7)-LR 971226IN-PLACE DENSITY X _,STING ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 12.."19/1997 Report No.: 9727519 Report Date 12/26/1997 Client No.: 71765000 Project No.: 43-2479-97 Client: erentiss Properties Limited, Inc. Project: Calling Center Atto: David Glass Coppell, Texas - .-.'.. 3890 W. N.W. Hx~, Suite 400 '~ ' Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction I.aboratory Test .Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements .NI/D No. Description Moistu re % Density pcf Moistu re Density 1 Gray limestone 16.0 I 11.5 Opt. or above 95% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pet) (% max) 341 SE comer, 40' south & 50' west, 1st lift 1 16.9 108.0 97 342 SE comer, 40' south & 100' west, 1st lift 1 17.0 106.1 95 343 SE comer, 40' south & 150' west, 1st lift 1 16.6 106.9 96 344 SE comer, 40' south & 200' west, 1st lift 1 16.7 107.8 97 345 SE comer, 40' south & 240' west, 1st lift 1 16.8 107.9 97 346 SE comer, 40' south & 290' west, 1st lift 1 16.3 107.5 96 347 SE comer, 40' south & 330' west, 1st lift 1 16.7 107.8 97 348 SE comer, 40' south & 390' west, 1st lift 1 16.6 107.7 97 349 SE comer, 40' south & 400' west, 1st lift 1 16.9 106.9 96 350 SE comer, 40' south & 420' west, 1st lift 1 17.0 106.3 95 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Premiss Properties Limited, Inc. (1) I lalff Associates, Inc. (I) Butler Construction ( 1 ) City of Coppell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer (1) Brockette Davis Drake, Inc. (1) City of Coppe!l This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07 Page I of 1