Loading...
Northlake 635(7)-LR 971223 ENG12qEERING, 12qC. 8901 Carpenter Frwy., Suite #100 Dallas. Texas 75247 Date of Service: 12/17/1997 Report No.: 9727315 Report Date 12/23/1997 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, InC.Attn: David Glass Project: Calling Centercoppell, Texas COPY 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction l.aboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density per Moisture Density 1 Gray limestone 16.0 111.5 Opt. or above 95% FIELD DENSITY TESTS TEST M/D MOISTL'RE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) Select 321 NE comer, 90' west & 60' south, 1st lift 1 16.6 109.9 99 322 NE comer, 90' west & 120' south, 1st lift 1 17.1 109.2 98 323 NE comer, 90' west & 190' south, 1 st lift 1 16.9 110.3 99 324 NE comer, 90' west & 230' south, 1st lift 1 16.7 110.5 99 325 NE comer, 90' west & 260' south, 1st lift 1 17.0 110.1 99 326 NE comer, 195' west & 250' south, 1st lift 1 17.2 110.2 99 327 NE comer, 195' west & 190' south, 1st lift 1 16.8 110.5 99 328 NE comer, 195' west & 110' south, 1 st lift I 16.4 110.8 99 329 NE comer, 195' west & 80' south, 1st lift 1 16.2 110.5 99 330 NE comer, 195' west & 40' south, Ist lift 1 16.3 110.9 100 331 NE corner, 290' west & 30' south, 1st lift 1 16.7 110.3 99 332 NE comer, 290' west & 90' south, 1st lift 1 16.9 109.2 98 This report is exclusively tbr the use of the client indtcated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. Page I of 2 - Report No.: 9727315 - TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pc0 (% max) 333 NE comer, 290' west & 130' south, 1st lift 1 17.1 109.9 99 334 NE comer, 290' west & 200' south, 1st lift 1 17.1 109.9 99 335 NE comer, 290' west & 250' south, 1 st lift 1 16.1 110.3 99 336 NE comer, 390' west & 260' south, 1st lift 1 16.2 110.5 99 337 NE comer, 390' west & 195' south, 1st lift 1 16.4 110.6 99 338 NE comer, 390' west & 135' south, 1st lift 1 16.1 110.4 99 339 NE comer, 390' west & 95' south, 1st lift 1 16.3 109.4 98 340 NE comer, 390' west & 40' south, 1st lift 1 16.4 110.6 99 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Prcntis$ Properties Limited. Inc. (1) Halff Assoc:ate$, Inc. ~ 1 ) Butler Construction (1) City of Coppeli Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer (1) Brockettc Davis Drake, Inc. (1) City of Coppcl] This report is exclusively for the use of the client indicated abo~e and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07 Page 2 of 2