Loading...
Northlake 635(9)-LR 970328 (5)Hooper Engineering LaboratoriE;s, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: East side of paving on south side of bldg. Cylind~ approx. 60' west of Lakeshore Dr. and 30' north East side of paving on south side of bldg. Cylind~ approx. 15' west of Lakeshore Dr. and 10' south SAMPLE DATA: SET 1 SET 2 Truck No. 396 731 TiCket No. 343378 343387 Time Batched 10:47am 12:15pm Time Sampled 11:20am 12:45pm Concrete Temp. (ASTM C1064) 72°F 75°F Air Content (ASTM C231) 6.1% 5.8% Unit Weight {ASTM C138) COMPRESSIVE STRENGTH TESTS [ASTM C39} Cylinder Slump '~ Age Test Number Inches Days Date (ASTM C143} 104 6.00' 7 04/04/97 105 6.00 28 04/25/97 106 6.00 28 04/25/97 107 6.00 56 05/23/97 96.1081 28 March 1997 Pioneer ;rs taken from of south curb. ;rs taken from of north curb. MIX NO. 9351 Cement 470 Type I Flyash Sand 1307 in. 1.0 in. 1840 Water 262 Admix #1 WRDA 79 @ Admix #2 AEA Darex II @ 3. 5.5 oz/yd oz/yd ! 08 5.50 7 04/04/97 109 5.50 28 04/25/97 110 5.50 28 04/25/97 111 5.50 56 05/23/97 (Standard 6 inch x 12 Total LOad Compressi~ Pounds Strength psi 82,600 2920 113,300 4010 113,000 4000 118,700 4200 28-Day Average 4010 92,000 3250 116,400 4120 114,900 4060 122,000 4310 28-Day Average 4090 *No water added on jobsite. Sampled going into pump. TECHNICIAN: DISTRIBUTION: 2870 Walnut Hill Lane RDG .ch cylinder) Ie (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis Dallas, Texas 75229 Required 28~Day Strength (214) 351-6419 4000 4000 Fax (214) 351-5148