Loading...
Northlake 635(7)-LR 971220 ENGINEEILING, INC. 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 12/15/1997 Report No.: 9727137 Report Date 12/20/1997 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell, Texas COPY 3890 W. N.W. Hx~.3,, Suite 400 Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction Laboratory Test Method: ASTM D-698 Field Test .Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSIIY RELATIONS: Maximum Project Requirements M/l) No. Description Moisture % Density pcf Moisture Density 1 Medium brown clay 22.5 102.5 Min. +4% 92% Fl ELD DENSITY TESTS TEST .M/D MOISTURE DRY DENSITY DENSITV NO TEST LOCATION No. (°fi.) (pcf) (% max) General Fill 301 SE comer, 30' north & 50' west, 7th lift 1 27.1 95.2 93 302 SE comer, 30' north & 50' west, Final lift 1 27.6 95.4 93 303 SE comer, 30' north & 140' west, 7th lift 1 26.9 95.3 93 304 SE comer, 30' north & 140' west, Final lift 1 27.1 94.9 93 305 SE comer, 30' north & 230' west, 7th lift 1 26.7 95.2 93 306 SE comer, 30' north & 230' west, Final lift 1 26.9 95.5 93 307 SE comer, 30' north & 320' west, 7th lift 1 27.1 95.3 93 308 SE comer, 30' north & 320' west, Final lift 1 27.4 95.4 93 309 SE comer, 30' north & 390' west, 7th lift 1 27.0 95.3 93 310 SE comer, 30' north & 390' west, Final lift 1 27.3 95.5 93 311 SE comer, 95' north & 400' west, 7th lift 1 27.6 95.6 93 312 SE corner, 95' north & 400' west, Final litt 1 27.5 94.9 93 This report is exclusively lbr the use of the client indicated above and shall not be reproduced except in Ihli without the written approval of I IBC Engineering, Inc. Page I of 2 TEST MID MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) 313 SE comer, 95' north & 330' west, 7th lilt 1 27.7 95.2 93 314 SE comer, 95' north & 330' west, Final Iifx 1 27.8 95.4 93 315 SE comer, 95' north & 250' west, 7th lift 1 26.9 95.2 93 316 SE comer, 95' north & 250' west, Final lilt 1 27.1 95.3 93 317 SE comer, 95' north & 180' west, 7th lift 1 26.5 95.9 94 318 SE comer, 95' north & 180' west, Final lift 1 26.9 95.4 93 319 SE comer, 95' north & 60' west, 7th lift 1 27.1 95.5 93 320 SE comer, 95' north & 60' west, Final lift 1 27.2 95.4 93 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited. Inc. (1) ttalffAssoc~ates, Inc. (1) Butler Construction (1) City of Coppell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) 11CBeck Con:factors Senior Project Engineer il) Brockette Davis Drake, Inc. (1) City of Coppell This report is exclusively for the use of the client indicated above and shal] not be reproduced except in full without the x~Titten approval of HBC Engineering, Inc. 07 Page 2 of 2