Loading...
Northlake 635(9)-LR 970326Hooper Engineering Laboratorie Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: T.A.S. Construction, Inc. DATE: PROJECT: Marek Office/Warehouse, 1233 Lakeshore Dr., Coppell JOB NO MATERIAL DESCRIPTION: 1) Select Fill - Orange & Tan Clayey Sand ASTM D 698 STANDARD PROCTOR: 1) 122.0 pcf (,03 7.0% Moisture 27) 28) 29) LOCATION PROCTOR LIFT Backfill at Perimeter Strip east wall, 40' south of north wall 1 Fin. Sub. north wall, 50' east of west wall 1 Fin. Sub. west Wall, 50' south o{ north wall 1 Fin. Sub. MOISTURE DRY CONTENT DENSITY % PCF 8.9 121.2 8.4 122.4-- 10.5 120.6" NOTE: Select fill was not observed in some areas of the finished subgrade. Densities on of backfill were not requested. TECHNICIAN: DISTRIBUTION: CDJ (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 ,S, Inc. 26 March 1997 .: 96.1081 PERCENT COMPACTION % 99.3 100.4 98.8 REQUIRED COMPACTION % 95+ Optimum +/- 3% ~y preceding lifts Fax (214) 351-5148