Loading...
Northlake 635(9)-LR 970320 (2)Hooper Engineering LaboratoriE LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: T.A.S. Construction, Inc. DATE: PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell SUPPLIER: Paving, north side of bldg. Cylinders taken from north of north side of bldg. and 2'-15' west of e; Paving, north side of bldg. Cylinders taken from of street approach. SAMPLE DATA: SET 1 SET2 MIX NO. 9351 Truck No. 390 756 Cement 470 Type I Ticket No. 349927 349942 Flyash Time Batched 8:26am 9:30am Sand 1307 Time Sampled 8:46am 10:02am in. Concrete Temp. (ASTM C1064) 66°F 68°F 1.0 in. 1840 Air Content (ASTM C231) 5.4% 5.0% Water 252 Unit Weight (ASTM C138) Admix #1 WRDA 79 @ Admix #2 AEA Darex II @ 2. COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 Cylinder Slump Age Test Total Load Compressi' Number Inches Days Date Pounds Strength {ASTM C143i psi 96 5.25 7 03~27~97 86,800 3070 97 5.25 28 04/17/97 ].10,900 3920 98 5.25 28 04/17/97 118,500 4190 99 5.25 56 05/15/97 122,200 4320 28-Day Average 4060 100 5.00 7 03~27~97 92,200 3260 101 5.00 28 04/17/97 125,400 4440 102 5.00 28 04/17/97 116,100 41_10 103 5.00 56 05/15/97 :t29,100 4570 28-Day Average 4280 ;s, Inc. 96.1081 20 March 1997 Pioneer approx. 10'-20' st curb. the south half 15.5 oz/yd 7 oz/yd TECHNICIAN: DISTRIBUTION: 2870 Walnut Hill Lane RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis rich cylinder) Required 28-Day Strength Dallas, Texas 75229 (214) 351-6419 4000 4000 Fax (214) 351-5148