Loading...
Northlake 635(7)-LR 971211 ENGLNEERING, INC. 8901 Carpenter Envy., Suite #100 Dallas, Texas 75247 Date of Service: 12/11/1997 Report No.: 9726180 Report Date 12/11/1997 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center Attn: David Glass Coppell. Texas COPY 3890 W. N.W. Hx~3,, Suite 400 ' Dallas TX 75220 Services: In-place density testing. PROJECT DATA CONTRACTOR: Butler Construction Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Medium brown clay 22.5 102.5 Min. +4% 92% 2 Yellowish tn sh cl w/sm gravel 20.0 108.0 Min. +4% 92% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pcf) (% max) 195 NW comer, 175' south & 50' east, 5th lift 2 25.9 101.1 94 196 NW corenr, 175' south & 55' east, 6th lift 2 25.7 101.2 94 197 Nn, V comer, 175' south & 120' east, 5th lift 2 24.8 101.0 94 198 NW comer, 175' south & 125' east, 6th lift 2 25.6 101.1 94 199 NW comer, 175' south & 200' east, 5th lift 2 24.9 100.8 93 200 NW comer, 175' south & 195' east, 6th lift 2 25.1 101.0 94 201 NW comer, 200' south & 190' east, 5th lilt 2 25.0 101.1 94 202 NW comer, 200' south & 185' eastm 6th lift 2 25.3 100.5 93 203 NW comer, 200' south & 140' east, 5th lift 2 24.7 100.7 93 204 NW comer, 200' south & 135' east, 6th lilt 2 24.9 100.9 93 205 NW comer, 200' south & 60' east, 5th lift 2 25.6 101.1 94 206 NW comer, 200' south & 55' east, 6th lilt 2 25.5 101.2 94 This report is exclusivcb- for the use of the client indicated above and shall not be reproduced except in full without the written approval of llBC Engineering, Inc. Page 1 of 2 COPY Report No.; 97261~80 H~C Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Prentiss Properties Limited, Inc. (1) l lalff Assocmtcs. Inc. (1) Butlcr Construction (1) City of Coppe:l Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer (1) Brockette Davis Drake. [nc. (1) City of Coppc!l This report is exclusively for the use of the client indicated above and shall not be reproduced except in full x~ithout thc written approval of IIBC Engineering, Inc. 07 Page 2 of 2 ENGINEERING. INC. 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 12/04/1997 Report No.: 9726281 Report Date 12."11/1997 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, inc. Project: Calling Center ~~~~ Attn: David Glass Coppell, Texas "~,,a$'" '~'~d~r 3890 W. N.W. Hx~3,, Suite 400 Dallas TX 75220 Services: In-place densi~, testing. PROJECT DATA CONTRACTOR: Butler Construction Laboratory Test Methnd: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements .M/D No. Description .Moisture % Density pcf Moisture Density I Medium brown clay 22.5 102.5 Min. --4% 92% 2 Yellowish tn sh cl w/sm gravel 20.0 108.0 Min. +4% 92% FIELD DENSITY TESTS TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (°d,,) (pc0 (% max) 207 NE comer, 45' south & 45' west, Final lilt 1 27.6 94.3 92 208 NE corner, 45' south & 145' west, Final lift 1 27.1 94.7 92 209 NE comer, 45' south & 225' west, Final lift I 26.9 95.1 93 210 NE comer, 45' south & 305' west, Final lift 1 27.0 94.6 92 211 NE comer, 45' south & 385' west, Final lift 1 27.3 94.4 92 212 NE comer, 100' south & 405' west, Final lift 1 27.2 94.6 92 213 NE comer, 100' south & 325' west, Final lift 1 26.8 95.2 93 214 NE comer, 100' south & 245' west, Final lift 1 27.0 94.9 93 215 NE comer, 100' south & 165' west, Final lift 1 26.9 94.8 93 216 NE comer, 100' south & 85' west, Final lift 1 26.9 94.7 92 217 NW comer, 150' south & 60' east, 6th lift 2 24.9 100.0 93 218 N*V comer, 150' south & 65' east, 7th lift 2 25.0 100.1 93 This report is exclusively for the use of the client indicated abox c and shall not be rep:-oduced except in full without the written approval of HBC Engineering, Inc. Page I of 2 - - OPY mc Report No,: 9726281 TEST M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (pc0 (% max) 219 NW comer, 150' south & 120' east, 6th lift 2 25.0 99.9 93 220 NW comer, 150' south & 125' east, 7th lift 2 25.1 99.8 92 221 NW comer, 150' south & 200' east, 6th lift 2 24.9 100.0 93 222 NW comer, 150' south & 205' east, 7th lift 2 25.1 99.7 92 223 Nq,V comer, 195' south & 200' east, 6th lift 2 25.3 99.5 92 224 NW comer, 195' south & 195' east, 7th lift 2 25.0 100.1 93 225 NW comer, 195' south & 140' east, 6th lift 2 24.7 100.0 93 226 NW comer, 195' south & 135' east, 7th lift 2 24.9 99.8 92 227 NW comer, 195' south & 70' east, 6th lift 2 25.6 100.0 93 228 NW comer, 195' south & 65' east, 7th lift 2 25.2 99.8 92 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Premiss Properties Limited. Inc. (1) Halt'f Associates. Inc. {.I ) Butler Construction (1) Cit.~ of Cop!aell Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) 11CBeck Contractoi's Senior Project Engineer ( 1 ) Brockette Davis Drake, lnc. ( 1 ) City of Coppel': This report is exclusively for the use of the client indtcated abox e and shall not be reproduced except in l'ull without the written approval of HBC Engineering, Inc. 07 Page 2 of 2