Loading...
Northlake 635(9)-LR 970320 (3)Hooper Engineering LaboratoriE;s, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Paving, north side of bldg. Cylin,d, ers ,taken from north of north side of bldg. and 2 -15 west of ea Paving, north side of bldg. Cylinders taken from of street approach. SAMPLE DATA: SET I SET 2 Truck No. 390 756 Ticket No. 349927 349942 Time Batched 8:26am 9:30am Time Sampled 8:46am 10:02am Concrete Temp. (ASTM C1064) 66°F 68°F Air Content (ASTM C231) 5.4% 5.0% Unit Weight (ASTM C138) COMPRESS/VE STRENGTH TESTS [ASTM C39) Cylinder Slump Age Test Number Inches Days Date (ASTM C143} 96 5.25 7 03/27/97 97 5.25 28 04/17/97 98 5.25 28 04/17/97 99 5.25 56 05/15/97 100 5.00 7 03/27/97 101 5.00 28 04/17/97 102 5.00 28 04/17/97 1 03 5.00 56 05/15/97 96.1081 20 March 1997 Pioneer TECHNICIAN: DISTRIBUTION: MIX NO. 9351 Cement 470 Type I Flyash Sand 1307 in. 1.0 in. 1840 Water 252 Admix #1 WRDA 79 @ Admix #2 AEA Darex II @ 2. 2870 Walnut Hill Lane (Standard 6 inch x 12 Total Load Pounds RDG ~pproxl 10'-20' st curb. :he south half 5.5 oz/yd Compressi~,e Strength psi oz/yd ch cylinder) 86,800 3070 110,900 3920 118,500 4190 28-Day Average 4060 92,200 3260 125,400 4440 116,100 4110 28-Day Average 4280 (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis Required 28-Day Strength (214) 351-6419 40OO Dallas, Texas 75229 4OOO Fax (214) 351-5148