Loading...
Northlake 635(9)-LR 970320 (5)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Paving, north side of bldg. Cylinders taken from east of west curb and 30'-45' south of north curl Paving, north side of bldg. Cylinders taken from a north of south curb and 60'-80' east of west curb SAMPLE DATA: SET 1 SET 2 MIX NO. 9351 Truck No. 497 497 Cement 470 Type I Ticket No. 349882 349902 Flyash Time Batched 5:35am 6:50am Sand 1307 Time Sampled 6:20am 7:10am in. Concrete Temp. (ASTM C1064) 61 °F 60°F 1.0 in. 1840 Air Content (ASTM C231) 6.4% 5.6% Water 252 Unit Weight (ASTM c13a) Admix #1 WRDA 79 @ Admix //2 AEA Darex II @ 3 COMPRESSIVE STRENGTH TESTS [ASTM C39) (Standard 6 inch x 12 Cylinder Slump Age Test Total Load Compressiv Number Inches Days Date Pounds Strength (ASTM C143) psi 88 5.50 7 03/27/97 89 5.50 28 04/17/97 90 5.50 28 04/17/97 91 5.50 56 05/15/97 92 6.00* 7 03~27~97 93 6.00 28 04117~97 94 6.00 28 04/17~97 95 6.00 56 05/15/97 *No water added on jobsite. 89,200 3160 28-Day Average 88,400 28-Day Average 3130 TECHNICIAN: DISTRIBUTION: RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis s, Inc. ~6.1081 :0 March 1997 'ioneer pprox. 2'-15' ~prox. 2'-1 2' 5.,5 oz/yd 2.7 oz/yd :h cylinder) Required 28-Day Strength 4000 4000 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148