Loading...
Northlake 635(9)-LR 970320 (6)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: Paving, north side of bldg. Cylinders ,taken from. north of north side of bldg. and 2'-15 west of ea Paving, north side of bldg. Cylinders taken from of street approach. SAMPLE DATA: SET 1 SET 2 MIX NO. 9351 Truck No. 390 756 Cement 470 Type I Ticket No. 349927 349942 Flyash Time Batched 8:26am 9:30am Sand 1307 Time Sampled 8:46am lO:02am in. Concrete Temp. (ASTM C1064) 66°F 68°F 1.0 in. 1840 Air Content iASTM C231) 5.4% 5.0% Water 252 Unit Weight IASTM C138) Admix //1 WRDA 79 @ Admix //2 AEA Darex II @ 2.~ COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 Cylinder Slump Age Test Total Load Compressiv Number Inches Days Date Pounds Strength (ASTM C143) psi 96 5.25 7 03~27~97 97 5.25 28 04/17~97 98 5.25 28 04/17~97 99 5.25 56 05/15/97 100 5.00 7 03/27197 101 5.00 28 04/17/97 102 5.00 28 04/17/97 103 5.00 56 05/15/97 86,800 3070 28-Day Average 92,200 28-Day Average 326O TECHNICIAN: RDG DISTRIBUTION: (1) Stanley Construction Co., LLP, LIo'yd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 ,s, Inc. )6.1081 ~-0 March 1997 ~ioneer pprox. 10'-20' ;t curb. he south half 15.$ oz/yd oz/yd ch cylinder) Required 28-Day Strength 4000 4000 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering CLIENT: PROJECT: Laboratorie Construction Materials Testing REINFORCING STEEL PLACEMENT INSPECTION T.A.S. Construction, Inc. Marek Office/Warehouse, 1233 Lakeshore Dr. Coppell, TX AREA INSPECTED: DATE OF INSPECTION: DEFICIENCIES NOTED: NUMBER None REMARKS: DATE: TECHNICIAN: DISTRIBUTION: JOB NO. TIME: Paving, north side of building 3/20/97 (5:00am-6:00am) LOCATION/ITEM DESCRIPTION Ail items reviewed were present and placed according to project specifications, at time of final inspection. RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis Dallas, Texas 75229 s, Inc. 0 March 1997 6.1081 .0 hour :oRREcTiONS OBSERVED ~lans and (214) 351-6419 2870 Walnut Hill Lane ......... i-~;'-~'' : ......... -7- .... : -F--' ................ ~ ....... 7* - .....................................................'-"'-' ....... ' Fax (214) 351-5148