Loading...
Northlake 635(9)-LR 970320 (7)Hooper Engineering Laboratorie Construction Materials Testing CLIENT: PROJECT: CONCRETE SUPPLIER: Pioneer LOCATION OF CONCRETE PLACED: REPORT OF CONCRETING OPERATIONS HE JOB NO. 96.1081 T.A.S. Construction, Inc. Marek Office/Warehouse, 1233 Lakeshore Dr., Coppell, TX Materials Cement: Brand VP Type _ Aggregate Size F.A. 0 - #4 Sand I.A. C.A. 1" - #4 Cr. Stone Actual Batch Computations: % Free Moisture Water North side of building paving I Source~ #22 Type Sobrce Pioneer Pioneer Actual Batch Wts. 517 1372 1840 Cement F.A. I.A. C.A. 5,0 65 Total Free Water Added at Mixer Total Water 65 lbs. 187 lbs. 252 lbs. DATE WEATI AIR D Mix 9." s, Inc. 20 March 1997 [ER: Clear FEMP: 43-68°F ~sign Mix ~51 , 4000 psi 2870 Walnut Hill Lane Dallas, Texas 75229 Max. Water-Cel Batch Weights ~ment I.A. 517 Admix :tRDA 7! Darex Time Started: Time Finished Concrete Plac, Concrete Temp Cylinders Mad Remarks: Certified Coz (214) 351-6419 nent Ratio by weight - S. S. Dry Basis: F.A. 1307 C.A. 1840 @ 15.5 oz/yd I @ 3.0 to 2.7 oz/yd ~d, c.y.: 6:00am 12:00 Noon 330 60-68°F 88 - 103 ~ect RDG Inspector Fax (214) 351-5148