Northlake 635(7)-LR 971202 ENGINEERING, INC.
8901 Carpenter Frwy.. Suite #100
Dallas, Texas 75247
Date of Service: 11/18/1997 Report No.: 9724963 Report Date
12/02/1997
Client No.: 71765000 Project No.: 43-2479-97
Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY
Attn: David Glass Coppell, Texas
3890 W. N.W. Hwy, Suite 400
Dallas TX 75220
Services: In-place densiW testing.
PROJECT DATA
CONTRACTOR: Butler Construction Laboratory Test Method: ASTM D-698
Field Test Method: ASTM D-2922
ASTM D-3017
MOISTURE DENSITY RELATIONS:
Maximum Project Requirements
MID No. Description .Moisture % Density pcf .Moisture Density
1 Yellowish tan shaley clay 20.0 108.0 +4% 92%
FIELD DENSITY TESTS
TEST M/D MOISTL'RE DRY DENSITY DENSITY
NO TEST LOCATION No. (%) (per) (% max)
Northeast Corner
37 70' S, 60'W, Lift 4 1 24.9 99.5 92
38 70' S, 60' W, Lift 5 1 26.1 99.8 92
39 70' S, 120' W, Lift 4 1 25.5 99.7 92
40 70' S, 120' W, Lift 5 1 25.9 100.1 93
41 70' S, 180' W, Lift 4 1 25.3 100.0 93
42 70' S, 180' W, Lift 5 1 25.9 100.3 93
43 140' S, 200' W, Lift 4 1 24.9 99.8 92
44 140' S, 200' W, Lift 5 1 25.3 100.5 93
45 140' S, 130' W, Lift 4 1 24.8 101.1 94
46 140' S, 130' W. Lift 5 1 25.9 100.9 93
47 140' S, 60' W, Lift 4 1 24.7 101.6 94
48 140' S, 60' W, Lift 5 1 24.9 101.5 94
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
07KG Page I of 2
Test results on this report meet project specification.
Technician: Tex King ~ Engineering, Inc.
Report Distribution:
(1) Premiss Properties Limited, Inc. {I) l lalff Associates, inc.
(l) Butler Construction (1) City of Coppcll Paul D. Smith, P.E.
(1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer
(1.l Brockette Davis Drake. Inc. I1 ) City ot'Coppcl~
This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval or' HBC Engineering, Inc.