Loading...
Northlake 635(7)-LR 971202 ENGINEERING, INC. 8901 Carpenter Frwy.. Suite #100 Dallas, Texas 75247 Date of Service: 11/18/1997 Report No.: 9724963 Report Date 12/02/1997 Client No.: 71765000 Project No.: 43-2479-97 Client: Prentiss Properties Limited, Inc. Project: Calling Center COPY Attn: David Glass Coppell, Texas 3890 W. N.W. Hwy, Suite 400 Dallas TX 75220 Services: In-place densiW testing. PROJECT DATA CONTRACTOR: Butler Construction Laboratory Test Method: ASTM D-698 Field Test Method: ASTM D-2922 ASTM D-3017 MOISTURE DENSITY RELATIONS: Maximum Project Requirements MID No. Description .Moisture % Density pcf .Moisture Density 1 Yellowish tan shaley clay 20.0 108.0 +4% 92% FIELD DENSITY TESTS TEST M/D MOISTL'RE DRY DENSITY DENSITY NO TEST LOCATION No. (%) (per) (% max) Northeast Corner 37 70' S, 60'W, Lift 4 1 24.9 99.5 92 38 70' S, 60' W, Lift 5 1 26.1 99.8 92 39 70' S, 120' W, Lift 4 1 25.5 99.7 92 40 70' S, 120' W, Lift 5 1 25.9 100.1 93 41 70' S, 180' W, Lift 4 1 25.3 100.0 93 42 70' S, 180' W, Lift 5 1 25.9 100.3 93 43 140' S, 200' W, Lift 4 1 24.9 99.8 92 44 140' S, 200' W, Lift 5 1 25.3 100.5 93 45 140' S, 130' W, Lift 4 1 24.8 101.1 94 46 140' S, 130' W. Lift 5 1 25.9 100.9 93 47 140' S, 60' W, Lift 4 1 24.7 101.6 94 48 140' S, 60' W, Lift 5 1 24.9 101.5 94 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 07KG Page I of 2 Test results on this report meet project specification. Technician: Tex King ~ Engineering, Inc. Report Distribution: (1) Premiss Properties Limited, Inc. {I) l lalff Associates, inc. (l) Butler Construction (1) City of Coppcll Paul D. Smith, P.E. (1) Alliance Architects, Inc. (1) HCBeck Contractors Senior Project Engineer (1.l Brockette Davis Drake. Inc. I1 ) City ot'Coppcl~ This report is exclusively for the use of the client indicated abox e and shall not be reproduced except in full without the written approval or' HBC Engineering, Inc. 07KG Page 2 of 2