Northlake 635(9)-LR 970319TECHNOLOGIES INC
Tdeidum~ (214) 631-2700
FAX= (214) 920-1891
RF~PORT OF
REINFORCING STEEL INSPECTION
CLIENT: Lincoln Property Co.
500 N. AKARD, SUITE 3300
ATTN= LARRY MOON
Dallas· TX 75201
PRO~ECT: COPPELL BUSINESS CENTER
WRANGLER DR. & BELTLINE RD.
COPPELL· TX
PROJECT NO.: 090~
REPORT NO.: 1133112
DATE OF SERVICE: ;/06/97
AUTHORIZATION:
REPORT DATE: 3/ 9/97
~RV~CF~: Perform Reinforcing Steel Inspection.
REPORT OF INSPECTION
on this date, reinforcing steel was observed for proper sidle, placement and
alignment prior to concrete placement. The results of thii~ inspection are
attached and were furnished to the contractor at the time ~f inspection.
Technician Time: 3:00pm to 6:30pm
Page I of 4
Technician:
Rusty Bowers
Technician
ReportDistribufion:
(1) LincoLn Property Co.
(1) .ROCI(ETT-DAVIS-DRAKE, iNC.
(1) T"E CITY OF COPPELL
¢1) Ta£ CITY OF C~PELL
(1) O'BRIE# ASSOCIATES, INC.
· B.S. Ch.E.
ect Manager