Loading...
Northlake 635(9)-LR 970313 (3)Hooper Engineering LaboratoriE Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: Tilt-up panel #38 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 131 Cement Ticket No. 342229 Flyash Time Batched 1 O: 10am Sand Time Sampled 10:55am in. Concrete Temp. IASTM C10641 76°F 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C13~) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) 84 5,00 7 03/11/97 85 5.00 28 04/10/97 86 5.00 28 04/10/97 87 5.00 56 05~08~97 JOB NO.: DATE: SUPPLIER: TECHNICIAN: DISTRIBUTION: 9337 470 Type l 1488 1840 266 Monex LR@ None (Standard 6 inch x 12 GKO Total Load Compressi~ Pounds Strength psi ;S, Inc. 96.1081 3 March 1997 'ioneer 4.4 oz/yd 103,700 3670 ~ch cylinder) 28-Day Average (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis Required 28-Day Strength 3000 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 ............... ~ ......... ~-~~ .......... i .... ~--~--~l .................................................... ll- Fax (214) 351-5148