Loading...
Northlake 635(9)-LR 970313 (4)Hooper Engineering Laboratories ~onstruction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB NO. 96.,,1081 CLIENT: T.A.S. Construction, Inc. =ROJECT: CONCRETE SUPPLIER: Pioneer mOCATION OF CONCRETE PLACED: Marek Office/Warehouse, 1233 Lakeshore Dr., Coppell, TX Materials Cement: Brand VP DATE: WEATHI R: AIR TI Mp: Aggregate , Size F.A. 0 - #4 I.A. C.A. 1" - #4 Tilt wall panels #42, 41, 40, 39, 38, 37 an Type I Source Bin @ Plant Type Source Sand Pioneer Ct. Stone Pioneer Actual Batch Wts. 47O 1562 1840 Des Mix 933 Max. Water-Ceme Batch Weights - Actual Batch Computations: % Free Moisture Water 5.0 74 Total Free Water Added at Mi~er Total Water 2870 Walnut Hill Lane Cement F.A. I.A. C.A. 74 lbs. 192 lbs. 266 lbs. ~ment I.A. 470 Admix Monex Time Started: Time Finished: Concrete Placec Concrete Temp: Cylinders Made: Remarks: Inc. d 36. 13 March 1997 Cloudy 70°F ign Mix 7 ,_~3_O_O_o~si nt Ratio by weight S. S. Dry Basis: 11:00am 12:30pm 60 76°F 84 - 87 Dallas, Texas 75229 F.A. 1488 C.A. 1840 @ 14.4 oz/yd , c.y.: Certified (214) 351-6419 Inspector Fax (214) 351-5148