Northlake 635(9)-LR 970313 (5)Hooper Engineering Laboratorie
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
CLIENT: T.A.S. Construction, Inc.
DATE:
PROJECT: Marek Office/Warehouse, 1233 Lakeshore Dr. JOB NO.
Coppell, TX
TIME:
AREA INSPECTED: Tilt wall panels: #41, 40, 38, 37, 36, 35, 34, 33, 32
DATE OF INSPECTION: 3/13/97 (10:00am-11:00am)
DEFICIENCIES NOTED:
NUMBER LOCATION/ITEM DESCRIPTION
NOTE:
Panels #38 & 42 were already poured before Hooper
Engineering technician could inspect them.
S, Inc.
3 March 1997
,6.1081
.0 hour
;ORRECTIONS
OBSERVED
TECHNICIAN:
DISTRIBUTION:
GKO
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) T.A.S. Construction, Inc., James Myers
(1) City of Coppell, Larry Davis
2870 Walnut Hill Lane
Dallas, Texas 75229
(214) 351-6419
Fax (214) 351-5148