Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Northlake 635(9)-LR 970305 (6)
Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: Tilt-up panels //13 and 15 LOCATION OF POUR SET 2: Tilt-up panels #23 and 21 SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 297 552 Cement 'Ticket No. 341583 341592 ~lyash Time Batched 7:50am 8:45am Sand Time Sampled 8:25am 9:18am in. Concrete Temp. (ASTM CIOG4t 65°F 64°F 1.0 in. Air Content (ASTM C231) 6.2°/, 6.2% WaTer .... Unit Weight (ASTM C]38) AcJ.mix #1 Admix #2 AEA JOB NO.: DATE: SUPPLIER: COMPRESSIVE S 9339 470 Type I 1347 1840 252 Hycol @ 15.( Darex II @ 3 ' · .(Standard 6 inch x 12 7 CYlinde~r ;;';'$ium~ ;- ~ Age~,- --, ;,~es¥"i:," ;-' '.Tptal, I;oad.., ~,,~Compressiv Number Inches Days Date '~ Pounds .... " Strength ,,,~. : . ~ASTM C1431 psi 69 5.25 6 03/11/97 93,800 3320 70 5.25 7 03/12/97 94,400 3340 71 5.25 28 04/02/97 ].13,600 4020 72 5.25 28 04/02/97 108,700 3850 - 73 5.25 56 04/30/97 120,100 4250 28-Day Average 3940 74 5.75 6 03/11/97 89,400 3160 75 5.75 7 03/12/97 93,000 3290 76 5.75 28 04~02~97 115,600 4090 77 5.75 28 04/02/97 109,900 3890 78 5.75 56 04/30/97 127,100 4500 28-Day Average 3990 TECHNICIAN: RDG DISTRiBUTIOI~.'. · ~1) Stanley Construction Co., LLP, (I) .Richmond Group, Jim Corkhill (1) T.A.S, Construction, Inc., James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 Fax (214) 351-5148 S, Inc. 6.1081 March 1997 'ioneer oz/yd z/yd " Requir~ ~,..,'~ 28.Day ~,...~, ' Strength 3OOO 3000 (214) 351-6419