Northlake 635(9)-LR 970303Hooper Engineering
CLIENT:
PROJECT:
Laboratorie
Construction Materials Testing
REINFORCING STEEL PLACEMENT INSPECTION
T.A.S. Construction, Inc.
Marek Office/Warehouse, 1233 Lakeshore Dr.
Coppell, TX
AREA INSPECTED:
DATE OF INSPECTION:
DEFICIENCIES NOTED:
NUMBER
TECHNICIAN:
DISTRIBUTION:
DATE:
2870 Walnut Hill Lane
JOB NO.
TIME:
Tilt-up panels (all 31 building panels)
3/4/97 (12:30pm-2:30pm)
LOCATION/ITEM DESCRIPTION
Panel #14, missing 2-#5 around the top of opening.
RDG
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) T.A.S. Construction, Inc., James Myers
(1) City of Coppell, Larry Davis
Dallas, Texas 75229 (214) 351-6419
s, Inc.
March 1997
6.1081
:.0 hours
:ORRECTIONS
OBSERVED
Yes
Fax (214) 351-5148