Loading...
Northlake 635(9)-LR 970224Hooper Engineering LaboratoriE:s, Inc. LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: T.A.S. Construction, Inc. DATE: PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell SUPPLIER: West ,side, paving. Cylinders taken from 20'-35' and 0 -15 south of north side of west paving po, West side paving. Cylinders taken from 40'-55' and 40'-55' south of north side of west paving p~ SAMPLE DATA: SET 1 SET2 MIX NO. 9351 Truck No. 497 296 Cement 517 Type I Ticket No. 341270 341278 Flyash Time Batched 6:55am 7:37am Sand 1307 Time Sampled 7:13am 8:01am in. Concrete Temp. (ASTM C1064) 65°F 65°F 1 .O in. 1840 Air Content (AS"DM C231) 6.4% 6.5% Water 252 Unit Weight (ASTM C138) Admix //1 WRDA 79 @ Admix #2 AEA Darex II ~ 3. COMPRESSIVE STREN~.TH,'T,E,.~.~,~s.~'MC39i" ':. (Standard 6 inch x 12 Cylinder Slum~) : .., ..Age.r ; ....... est Total_Load`r Compressn Nbmber .-'~ :IncHes ';~ ;Da~s .... " Date ' ' pounds ' '~ Strenet~ (ASTM C143) psi '~ 49 5.25 7 03/03/97 106,800 3780 50 5.25 28 03/24/97 132,700 4690 51 5.25 28 03/24/97 ].33,500 4720 52 5.25 56 04/21/97 ].46,800 5190 28-Day Average 4700 53 5.50 7 03/03/97 106,500 3770 54 5.50 25 03/24/97 133,700 4730 55 5.50 28 03/24/97 13~;,300 4790 56 5.50 56 O4/21/97 148,800 5260 28-Day Average 4760 RDG TECHNICIAN: DISTRIBUTION: t6.1081 !4 February 1997 Pioneer vest of bldg. slab Ir, vest of bldg. slab )ur. 2870 Walnut Hill Lane 5.5 oz/yd oz/yd ch cylinder) 'e ~Required ~:i' ~Strengm {1) Stanley Construction Co., LLP, Lloyd A. White (1') Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis Dallas, Texas 75229 (214) 351-6419 4OO0 4000 Fax (214) 351-5148