Loading...
Northlake 635(9)-LR 970224 (05)Hooper Engineering LaboratoriE;s, Inc. LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: T.A.S. Construction, Inc. DATE: PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell SUPPLIER: West side paving. Cylinders taken from 30'-50' of paving and 100'-115' north of south curb. South side (west half paving). Cylinders taken fr of south curb and 30'-45' east of west curb. SAMPLE DATA: SET 1 SET 2 MIX NO. 9351 Truck No. 454 567 Cement 517 Type I Ticket NO. 341289 348761 Flyash Time Batched 8:35am 9:47am Sand 1307 Time Sampled 9:14am 10:17am in. Concrete Temp. (ASTM C1064) 65°F 66°F 1.0 in. 1840 Air Content (ASTM C231i 6.2% 5.2% Water 252 Unit Weight (ASTM C1381 Admix #1 WRDA 79 @ Admix #2 AEA Darex II @ 2. COMPRESSIVE STRENGTH TESTS (ASTM C39~ (Standard 6 inch x 1 2 96.1081 24 February 1997 Pioneer last of west edge )m 25'-40' north 5.5 oz/yd oz/yd ~ch cylinder) Cylinder Slump Age Test Total Load Compressi~ Number Inches Days Date Pounds Strength (ASTM C143) psi 57 5.25 7 03/03/97 112,700 3990 58 5.25 28 03/24/97 142,500 5040 59 5.25 28 03/24/97 134,300 4750 60 5.25 56 04/21/97 28-Day Average 4890 01 5.25 7 03/03/97 117,200 41 50 62 5.25 28 03/24/97 Z40,700 4980 63 6.25 28 03/24/97 146,200 ~;170 64 5.25 56 04/21/97 28-Day Average 5070 Required 28-Day Strength 4000 4000 TECHNICIAN: DISTRIBUTION: RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 ...... r ..... r .... -~--~