Loading...
Northlake 635(9)-LR 970224 (08)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: T.A.S. Construction, Inc. PROJECT: Marek Office/Warehouse, 1233 Lakeshore, Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: West side paving. C¥1i.n, ders taken from 30'-50' of paving and 100'-115 north of south curb. South side (west half paving). Cylinders taken fr of south curb and 30'-45' east of west curb. SAMPLE DATA: SET 1 SET 2 MIX NO. 9351 Truck No. 454 557 Cement 517 Type Ticket No. 341289 348761 Flyash Time Batched 8:35am 9:47am Sand 1307 Time Sampled 9:14am 10:17am in. Concrete Temp. (ASTM C1064) 65°F 66°F 1.0 in. 1840 Air Content (ASTM C231) 6.2% 5.2% Water 252 Unit Weight {ASTM C138) Admix //1 WRDA 79 Admix #2 AEA Darex II @ COMPRESSIVE STRENGTH TESTS tASTM C39) (Standard 6 inch x 12 Cylinder Slump Age Test Total Load Compressiv Number Inches Days Date Pounds Strength (ASTM C143} psi 57 5.25 7 03/03/97 58 5.25 28 03/24/97 59 5.25 28 03124/97 60 5.25 56 04/21/97 61 5.25 7 03/03/97 62 5.25 28 03/24/97 63 5.25 28 03/24/97 64 5.25 56 04/21/97 112,700 3990 28-Day Average 117,200 28-Day Average 4150 ,S, Inc. )6.1081 !4 February 1997 ~ioneer asr of west edge m 25'-40' north 15.5 oz/yd oz/yd ch cylinder) e Required 28-Day Strength 4000 4000 TECHNICIAN: DISTRIBUTION: 2870 Walnut Hill Lane RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) T.A.S. Construction, Inc., James Myers (1) City of Coppell, Larry Davis Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148