Loading...
Northlake 635(9)-LR 970224 (10)Hooper Engineering Laboratorie,, Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE JOB NO. 96. 1081 CLIENT: T.A.S. Construction, Inc. PROOECT: Marek Office/Warehouse, 1233 Lakeshore Dr., Coppell, TX CO~RETE SUPPLIER: Pioneer LOCATION OF CONCRETE PLACED: DATE: WEATH AIR T Paving, west side and south side (only west Cement: Brand VP Aggregate Size F.A. 0 - #4 I.A. C.A. 1" - #4 Type Materials I, S0urce~kkL2_~ts 22 & 19 Type 50b~ce Sand Pioneer Ct. Stone Pioneer Actual Batch Computations: % Free Moisture Water 5.0 65 Cement F.A. I.A. C.A. Total Free Water Added at Mixer Total Water Actual Batch Wts. 517 1372 1840 65 lbs. 187 lbs. 252 lbs. De Mtx..gJ Max. Water-Cem Batch Weights Inc. 24 February' 1997 5~: Cloudy* ~: 51-54°F half). sign Mix 51,4000 psi snt Ratio by weight - S. S. Dzy Basis: 2870 Walnut Hill I.~ne Dallas, Texas 75229 Cement 517 ' F.A. 1307 1.A.' C.A. 1840 Admix wRDA 7§ ~ !'5'~5:':Oz/yd Darex I e 3,0 to 2,7 oz/yd Time Started: Time Finished Concrete Plac, COncrete Temp Cylinders Mad, Remarks: *Lig~ 12~4 Certified Cot: (214) 351-6419 7:00am 2:15pm c.y.: 520 65-67°F 4.9 - 68 rainfall started at 5pm. ect RDG Inspector Fax (214) 351-5148