Northlake 635(9)-LR 970224 (10)Hooper Engineering Laboratorie,,
Construction Materials Testing
REPORT OF CONCRETING OPERATIONS
HE JOB NO. 96. 1081
CLIENT: T.A.S. Construction, Inc.
PROOECT: Marek Office/Warehouse, 1233 Lakeshore Dr., Coppell, TX
CO~RETE SUPPLIER: Pioneer
LOCATION OF CONCRETE PLACED:
DATE:
WEATH
AIR T
Paving, west side and south side (only west
Cement:
Brand VP
Aggregate
Size
F.A. 0 - #4
I.A.
C.A. 1" - #4
Type
Materials
I, S0urce~kkL2_~ts 22 & 19
Type 50b~ce
Sand Pioneer
Ct. Stone Pioneer
Actual Batch Computations:
% Free
Moisture Water
5.0 65
Cement
F.A.
I.A.
C.A.
Total Free Water
Added at Mixer
Total Water
Actual
Batch Wts.
517
1372
1840
65 lbs.
187 lbs.
252 lbs.
De
Mtx..gJ
Max. Water-Cem
Batch Weights
Inc.
24 February' 1997
5~: Cloudy*
~: 51-54°F
half).
sign Mix
51,4000 psi
snt Ratio by weight
- S. S. Dzy Basis:
2870 Walnut Hill I.~ne
Dallas, Texas 75229
Cement 517 ' F.A. 1307
1.A.' C.A. 1840
Admix
wRDA
7§ ~ !'5'~5:':Oz/yd
Darex I e 3,0 to 2,7 oz/yd
Time Started:
Time Finished
Concrete Plac,
COncrete Temp
Cylinders Mad,
Remarks: *Lig~
12~4
Certified Cot:
(214) 351-6419
7:00am
2:15pm
c.y.: 520
65-67°F
4.9 - 68
rainfall started at
5pm.
ect RDG
Inspector
Fax (214) 351-5148