Loading...
Northlake 635(9)-LR 970210 (3)Hooper Engineering Laboratorie,, Construction Materials Testing CLIENT: PROJECT: CONCRETE SUPPLIER: Pioneer LOCATION OF CONCRETE PLACED: REPORT OF CONCRETING OPERATIONS HE JO8 NO. 96.1081 T.A.S. Construction, Inc. DATE: Marek Office/Warehouse,'1233 Lakeshore Dr., Coppell, TX WEATH AIR T 12' belled piers for perimeter fence (See of 2/10/97). Materials T Source Rin e plant #29 Type Source Sand Pioneer Ct. Stone Pioneer Cement: Brand VP Aggregate Size F.A. 0 - #4 I.A. C.A. 1" - #4 Type Actual Batch Computations: % Free Moisture Water 5,0 72, Actual Batch Wts. 470 1520 1840 72 lbs. 194 lbs. 266 lbs. Dallaa, Texaa 75229 Max. Water-Cern Batch Weights Total Free Water Added at Mixer Total Water 2870 Walnut Hill lane Cement F.A. I.A. C.A. Cement 470 I.A. Admix WRDA 4 Time Started: Time Finished: Concrete Place Concrete Temp Cylinders Mad, Remarks: Certified Cot (214) 351-6419 Inc. 10 February 1997 Partly Cloudy -~P: 48.55°F ~ier Inspection Report sign MAx L17_,~si )nt Ratio by weight S. S. O:y Bas~s: F.A. 1448 C.A. 1840 14.1 oz/yd lO:lOam 2:OOpm 18 56-58°F 45 - 48 Fax (214) 351-5148 ect RDG Inspector