Northlake 635(9)-LR 970210 (3)Hooper Engineering Laboratorie,,
Construction Materials Testing
CLIENT:
PROJECT:
CONCRETE SUPPLIER: Pioneer
LOCATION OF CONCRETE PLACED:
REPORT OF CONCRETING OPERATIONS HE JO8 NO. 96.1081
T.A.S. Construction, Inc. DATE:
Marek Office/Warehouse,'1233 Lakeshore Dr., Coppell, TX WEATH
AIR T
12' belled piers for perimeter fence (See
of 2/10/97).
Materials
T Source Rin e plant #29
Type Source
Sand Pioneer
Ct. Stone Pioneer
Cement:
Brand VP
Aggregate
Size
F.A. 0 - #4
I.A.
C.A. 1" - #4
Type
Actual Batch Computations:
% Free
Moisture Water
5,0 72,
Actual
Batch Wts.
470
1520
1840
72 lbs.
194 lbs.
266 lbs.
Dallaa, Texaa 75229
Max. Water-Cern
Batch Weights
Total Free Water
Added at Mixer
Total Water
2870 Walnut Hill lane
Cement
F.A.
I.A.
C.A.
Cement 470
I.A.
Admix WRDA 4
Time Started:
Time Finished:
Concrete Place
Concrete Temp
Cylinders Mad,
Remarks:
Certified Cot
(214) 351-6419
Inc.
10 February 1997
Partly Cloudy
-~P: 48.55°F
~ier Inspection Report
sign MAx
L17_,~si
)nt Ratio by weight
S. S. O:y Bas~s:
F.A. 1448
C.A. 1840
14.1 oz/yd
lO:lOam
2:OOpm
18
56-58°F
45 - 48
Fax (214) 351-5148
ect RDG
Inspector