Northlake 635(9)-LR 970122 (3)Hooper Engineering Laboratorie
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TEST~;
CLIENT: T.A.S. Construction, Inc.
DATE:
PROJECT: Office/Warehouse Building, Lakeshore Dr., Coppell
JOB NC
MATERIAL DESCRIPTION: 1) Lime Stabilized Subgrade - Grey & Brown Clay witl~
ASTM D 698 STANDARD PROCTOR: 1) 91.0 pcf @ 28.0% Moisture
21)
22)
23)
24)
LOCATION
Parkin~l Area
north fire lane, centerline @ 1
center of bldg.
west fire lane @ north bldg. line 1
west fire lane @ south bldg. line 1
south fire lane, centerline @ 1
"center of bldg.
PROCTOR LIFT
MOISTURE DRY
CONTENT DENSITY
% PCF
Final 26.1 90.0
Final 26;8 '88.7
Final 27.0 87.0:
Final 25.9 90.5
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) T.A.S. Construction, Inc., James Myers
(1) City of Coppell, Larry Davis
2870 Walnut Hill Lane
Dallas, Texas 75229
,s, Inc.
22 January 1997
.: 96.1081
Lime
PERCENT
OMPACTION
%
98.9
97.5
95.6
99.5
(214) 351-6419
REQUIRED
COMPACTION
%
Fax (214) 351-5148
95+
Optimum +/- 3%