Loading...
Northlake 635(9)-LR 970122 (5)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE 308 NO. 96,1081 CLIENT: TAS Construction DATE PRO3ECT: Office/Warehouse Building, Lakeshore Dr., COppell, TX NEAT CO~CRETE SUPPLIER: Pioneer AIR LOCATION OF CONCRETE PLACED: 10 Piers (See Pier Inspection RePort of VP Aggregate Size 0 - #4 Materials O Mix ~ Type I Source~29 Max. Water-Ce Type Source Batch Weights Cement: Brand FoA. I.A. C.A. ~nd Pioneer Cement 470 Ct. Stone Pioneer 1"- #4 Actual Batch Computations: ~ Free Moisture Water s, Inc. 22 January 1997 [ER: Cl ear ;ENP: 64°F 5,,0 74 Total Free Water Added at Mixer Total Water 2870 Walnut Hill Lane Cement F.A. I.A. C.A. 1/22/97) ~sign Mix ]37,3000 psi ~ent Ratio by weight - S. S. O~j Basis: F.A. 1448 I.A. C.A. 1840 Admix WRDA d0 e 14.1 oz/.yd Time Started: Actual Batch Wts. .Time Finished 470 Concrete Plac 1562 Concrete Temp -Cylinders Mad 1840 Remarks: Rig stol '74 lbs. Tec) thi 192 lbs. 266 lbs. Certified Col Dallas, Texas 75229 (214) 351-6419 d, c.y.: 11:15am 1:15pm 50 68°F 21 - 24 2:45pn 6;00pn broke down. Pier drillin~ ,ped from 1:15pm-2:45pm. mician left job during time. :ect LS Inspector Fax (214) 351-5148