Northlake 635(9)-LR 970121 (2)Hooper Engineering LaboratoriE
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: TAS Construction
PROJECT: Marek Office/Warehouse, 1233 Lakeshore
LOCATION OC~)~J~ ~;E:['XI: Piers: A/4.7 and A/5.1
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. 100 Cement
Ticket No. 334187 Flyash
Time Batched 1:45pm Sand
Time Sampled 2:35pm in.
Concrete Temp. {ASTM C1064l 72°F 1.0 in.
Air Content (ASTM C231! Water
Unit Weight (ASTM C138) Admix //1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
JOB NO.:
DATE:
SUPPLIER:
;s, Inc.
96.1081
21 January 1997
Pioneer
Cylinder Slump Age Test
Number Inches Days Date
{ASTM C143)
17 4.75 7 01 ~28~97
18 4.75 28 02/18~97
19 4.75 28 02/18~97
20 4.75 56 03/18/97
TECHNICIAN: LS
9337
470 Type
1488
1840
266
WRDA 40
(Standard 6 inch x 12
14.1 oz/yd
Total Load Compressi'
Pounds Stren.gth
ps~
97,300 3440
148,300 5250
153,100 5420
163,700 5790
28-Day Average 5340
nch cylinder)
le
Required
28-Day
Strength
3OO0
DISTRIBUTION:
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) TAS Construction, James Myers
(1) City of Coppell, Larry Davis
2870 Walnut Hill Lane
Dallas, Texas 75229
(214) 351-6419
Fax (214) 351-5148