Northlake 635(9)-LR 970120 (3)Hooper Engineering
LaboratoriE;s, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: TAS Construction
PROJECT: r~arek 0ffice/t~.areh0use, 1233 Lakesho~e
LOCATION oCF'0~)eL}F:? ~;EJl'~l:'~v Piers: F/2, F/1.5, D.8/1 and C.9/1
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. 551 Cement
Ticket No. 334051 Flyash
Time Batched 9:45am Sand
Time Sampled 10:15am in.
Concrete Temp. (ASTM C1064) 60°F 1.0 in.
Air Content (ASTM C231} Water
Unit Weight (ASTM C13e} Admix //1
Admix //2
AEA
COMPRESSIVE STRENGTH TESTS IAsTM C39)
Cylinder Slump Age Test
Number Inches Days Date
(ASTM (~143)
13 4.50 7 01 ~27~97
14 4.50 28 02/17/97
15 4.50 28 02/17~97
16 4.50 56 03/17/97
LS
TECHNICIAN:
DISTRIBUTION:
2870 Walnut Hill Lane
JOB NO.:
DATE:
SUPPLIER:
9337
470 Typel
1488
1840
266
WRDA 40 @
96.1081
20 January 1997
Pioneer
(Standard 6 inch x 12
Total Load
Pounds
4.1 oz/yd
ch cylinder)
Required
28-Day
Strength
Compressii'e
Strength
psi
124,400 4400
156,700 5540
156,200 5530
175,000 6190
28-Day Average 5540
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) TAS Construction, James Myers
(1) City of Coppell, Larry Davis
Dallas, Texas 75229
30OO
(214) 351-6419
Fax (214).351-5148