Northlake 635(2)-LR 970118 (2)Hooper Engineering Laboratorie
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: TAS Construction
PROJECT: Office/Whse. Bldg., Lakeshore Dr., Coppell, TX
LOCATION OF POUR SET 1: Belled piers: E.9/1 and E.6/1
LOCATION OF POUR SET 2:
JOB NO.:
DATE:
SUPPLIER:
SAMPLE DATA: SET 1
Truck No. 731
Ticket No. 333966
Time Batched 11:55am
Time Sampled 1:50pm
Concrete Temp. [ASTM ClOe4~ 60°F
Air Content (ASTM C231)
Unit Weight (ASTM C138)
SET 2
MIX NO. 9337
Cement 470 Type
FIyash
Sand 1488
in.
1.0 in. 1840
Water 2.66
Admix //1 WRDA 40
Admix //2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch~ x 1 2 i
Cylinder Slump Age Test
Number .... -'lnches ~ ~' Days Date
(ASTM C143)
Total LOad Compressiv
Pounds Stren.gth
psi
9 4.50 7 01/25/97
10 4.50 28 02/15/97
11 4.50 28 02/15/97
12 4.50 56 03/15/97
115,800 4100
151,100 5340
150,800 5330
169,100 5980
28-Day Average 5340
s, Inc.
16.1081
8 January 1997
'ioneer
14.1 oz/yd
~ch cylinder)
Required.
28-Day
Strength
3OOO
TECHNICIAN:
DISTRIBUTION:
2870 Walnut Hill Lane
.... ,.-. ~-----] ...... : ......
LS
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) TAS ConStruction, James Myers
(1) City of Coppell, Larry Davis
Dallas, Texas 75229 (214) 351-6419
Fax (214) 351-5148