Loading...
Northlake 635(2)-LR 970118 (2)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: TAS Construction PROJECT: Office/Whse. Bldg., Lakeshore Dr., Coppell, TX LOCATION OF POUR SET 1: Belled piers: E.9/1 and E.6/1 LOCATION OF POUR SET 2: JOB NO.: DATE: SUPPLIER: SAMPLE DATA: SET 1 Truck No. 731 Ticket No. 333966 Time Batched 11:55am Time Sampled 1:50pm Concrete Temp. [ASTM ClOe4~ 60°F Air Content (ASTM C231) Unit Weight (ASTM C138) SET 2 MIX NO. 9337 Cement 470 Type FIyash Sand 1488 in. 1.0 in. 1840 Water 2.66 Admix //1 WRDA 40 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch~ x 1 2 i Cylinder Slump Age Test Number .... -'lnches ~ ~' Days Date (ASTM C143) Total LOad Compressiv Pounds Stren.gth psi 9 4.50 7 01/25/97 10 4.50 28 02/15/97 11 4.50 28 02/15/97 12 4.50 56 03/15/97 115,800 4100 151,100 5340 150,800 5330 169,100 5980 28-Day Average 5340 s, Inc. 16.1081 8 January 1997 'ioneer 14.1 oz/yd ~ch cylinder) Required. 28-Day Strength 3OOO TECHNICIAN: DISTRIBUTION: 2870 Walnut Hill Lane .... ,.-. ~-----] ...... : ...... LS (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) TAS ConStruction, James Myers (1) City of Coppell, Larry Davis Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148