Northlake 635(2)-LR 970118 (3)Hooper Engineering
LaboratoriE;s, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: TAS Construction
PROJECT: Office/Whse. Bldg., Lakeshore Dr., Coppell, TX
LOCATION OF POUR SET 1: Belled piers: E.9/1 and E.6/1
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1
Truck No. 731
Ticket No. 333966
Time Batched 11:55am
Time Sampled 1:50pm
Concrete Temp. (ASTM ClOe4) 60°F
Air Content (ASTM C231)
Unit Weight {ASTM C138)
SET 2
COMPRESSIVE STRENGTH TESTS (ASWa C39~
Cylinder Slump Age Test
Number Inches Days Date
(ASTM Cl 43)
9 4.50 7 01/25/97
10 4.50 28 02/15/97
11 4.50 28 02115/97
12 4.50 56 03/15197
TECHNICIAN:
DISTRIBUTION:
2870 Walnut Hill Lane
JOB NO.:
DATE:
SUPPLIER:
MIX NO. 9337
Cement 470 Type
Flyash
Sand 1488
ir~.
1.0 in. 1840
Water 266
Admix //1 WRDA 40
Admix //2
AEA
(Standard 6 inch x 12
96.1081
18 January 1997
Pioneer
14.1 oz/yd
nch cylinder)
Total Load Compressi,
Pounds Strength
Psi'
115,800 4100
28-Day Average
~e
Required
28-Day
Strength
LS
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) TAS Construction, James Myers
(1) City of Coppell, Larry Davis
Dallas, Texas 75229
(214) 351-6419
Fax (214) 351-5148
3000