Northlake 635(2)-LR 970116 (2)Hooper Engineering
LaboratoriE;s, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: TAS Construction
PROJECT: Office/Whse. Bldg., Lakeshore Dr., Coppell, TX
Belled piers: B/4, C/4 and D/4
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MIX NO.. 9337
Truck No. 144 Cement
Ticket No. 333913 Flyash
Time Batched 9:08am Sand
Time Sampled 10:02am in.
Concrete Temp. {ASTM C1064) 57°F 1.0 in.
Air Content (ASTM C231} Water
Unit Weight (ASTM C138) Admix //1
Admix//2
AEA
JOB NO.:
DATE:
SUPPLIER:
COMPRESSIVE STRENGTH TESTS IASTM C39~
470Typel
1488
1840
266
WRDA 40@
(Standard 6 inch x 12
Cylinder Slump Age Test Total Load Compressi~
Number Inches Days Date Pounds Strength
(ASTM C143) psi
5 5.50 7 01/23/97
6 5.50 28 02/13/97
7 5.50 28 02/13/97
8 5.50 56 03/13/97
TECHNICIAN:
DISTRIBUTION:
113,100 4000
28-Day Average
RDG
(1) Stanley Construction Co., LLP, Lloyd A. White
(1) Richmond Group, Jim Corkhill
(1) TAS Construction, James Myers
(1) City of Coppell, Larry Davis
(214) 351-6419
Dallas, Texas 75229
)6.1081
January 1997
Pioneer
14.1 oz/yd
nch cylinder)
Required
28-Day
Strength
2870 Walnut Hill Lane
3OO0
Fax (214) 351-5148