Loading...
Northlake 635(2)-LR 970116 (3)Hooper Engineering' Laboratorie Construction Materials Testing BELLED PIER INSTALLATION OBSERVATION CLIENT: TAS Construction DATE: 16 PROJECT: Office/Warehouse Bldg., Lakeshore Dr., Coppell JOB NO.: 96. DRILLER: Dallas FoUndation Drilling TIME: 7:0~ 6.0 PIER SHAFT BELL ALIGN/ REQ'D INITIAL FINAL FINAL MARK DIA. SIZE PLUMB DEPTH DEPTH DEPTH POUR B/5 C/5 D/5 E/5 BI4 C/4 D/4 E/4 24" 48" ok/ok 19.0' 19.9' 20.4' 12:05 24" 48" ok/ok 19.0' 19.7' 19.7' 11:13 24" 48" ok/ok 19.0' 19.6' 19.7' 11:06 24" 48" ok/ok 19.0' 19.5' 19.6' 12:20 24" 48" ok/ok 19.0' 19.8' 19.8' 9:53 24" 48" ok/ok 19.0' 19.5' 19.8' 10:00 24" 48" ok/ok 19.0' 19.9' 19.9' 10:07 24" 48" ok/ok 19.0' 19.0' 19.0' 11:00 REMARKS: 1) Pier reinforcing verified to be correct in accordance with project plan~ unless noted otherwise. 2) Concrete placed in piers within 8 hours of drilling completion, unless 3) Required Depth is based upon existing grade at time of geotechnical bearing strata achieved, unless noted otherwise. 4) Initial Depth, Final Depth, and Top of Concrete Elevation, are relative piers were drilled. Contractor must furnish actual elevation, if requin 5) One drill rig in use this day. TECHNICIAN: DISTRIBUTION: RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) TAS Construction, James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 s, Inc. lanuary 1997 1081 )am-1 :OOpm hours TOP OF WATER CONC. ELEV. IN HOLE + 0.2' None +0.2' None -0.0' None + O. 1' None -0.0' None + O. 1' Trace + O. 1' None + 0.2' None and specifications, ~oted otherwise. investigation. Correct to grade at time ;d. (214) 351-6419 Fax (214) 351-5148