Loading...
Northlake 635(2)-LR 970115 (2)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: TAS Construction DATE: PROJECT: Office/Whse. Bldg., Lakeshore Dr., Coppell, TX SUPPLIER: LOCATION OF POUR SET 1: Belled piers: E.9/1.5, E/3, D/3, D/2 and E/2 LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 9337 Truck No. 136 Cement 470 Type Ticket No. 335241 FIyash Time Batched 2:1 Opm Sand 1488 Time Sampled 2:48pm in. Concrete Temp. (ASTM C1064) 57°F 1.0 in. 1840 Air Content (ASTM C231) Water 266 Unit Weight (ASTM C13S) Admix #1 WRDA 40 Admix 82 AEA COMPRESSIVE STRENGTH TESTS IAST~ c391 {Standard 6 inch, x 12 if Cylinder Slump Age Test Total Load Compressiv Number Inches Days Date Pounds Strength (ASTM C143) psi 1 5.50 7 01/22/97 105,200 3720 2 5.50 28 02/12t97 134,800 4770 3 5.50 28 02/12/97 141,100 4990 4 5.50 56 03/12/97 28-Day Average 4880 NOTE: No water added on jobsite, TECHNICIAN: DISTRIBUTION: RDG (1) Stanley Construction Co., LLP, Lloyd A. White (1) Richmond Group, Jim Corkhill (1) TAS Construction, James Myers (1) City of Coppell, Larry Davis 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 s, Inc. ~6.1081 5 January 1997 'ioneer i4.1 oz/yd ~ch cylinder) Required 28-Day Strength 3000 Fax (214) 351-5148