Loading...
Northlake 635(2)-LR 970115 (4)Hooper Engineering Laboratorie Construction Materials Testing REPORT OF CONCRETING OPERATIONS HE .1OB NO. 96.1081 CLIENT: TAS Construction PROJECT: 0ffi ce/Warehouse Buil ding, Lakeshore Dr., COppel 1, TX CONCRETE SUPPLIER: Pioneer LOCATION OF CONCRETE PLACED: DATE )EAT AIR 10 belled piers (See Pier Inspection Rep s, Inc. Materials Cement: Brand VP Type I Source Bin ~ Plant #22 Aggregate Type Source Size F.A. 0- #4 Sand Pioneer I.A. C.A. 1" - #4 Cr. Stone Pioneer Actual Batch Computations: ~ Free~ Actual Moisture Water Batch Wts. Cement 470 F.A. 5.0 74 1562 I.A. C.A. 1840 Total Free Water Added at Mixer Total Water 74 lbs. 192 lbs. 266 lbs. 2870 Walnut Hill Lane Dallas, Texas 75229 O Mix 9 Max. Water-Ce Batch Weights 15 JanuaKy 1997 IER: Clear/Very Windy TEMP: 56-58°F )rt of 1/15/97) Cement 470 I.A. Admix WRDA 4 F.A. 14~ C.A. 1840 , 14.1 oz/vd Time Started: Time Finished Concrete Plac Concrete Temp Cylinders Mad Remarks: d, c.Y.: 2: 30pm 5:15pm 17 57°F 1-4 Certified Cor (214) 351-6419 :ect RDG .Inspector Fax (214) 351-5148 Isign .Mix 337 , 3000 psi ~ent Ratio by weight - S. S. D~7 Basis: