Loading...
Northlake 635(3)-LR 971207WATER INJECTION OBSERVATION Client No.: Client: Project: Project No.: Location: Procedure: 52617000 Lincoln Property Company Coppell Business Center II Belt Line Rd. & Lakeshore Dr. 43-2452-97 Building C Report No.: 9726, Date of Service: 12/05 General Contractor: Butl, Injector: On 12/07/97, a representative of HBC Engineering, Inc. observer of water at this site. During the injection process, the following < recorded: Pass No.: 4th No. of Probe 4 Probe Length 1 4747 lrvin8 Boulevard, Suite 206 Dallas, Tcxa~ 75247 t79 /97 Construction th Moore, Inc. the injection of bscrvations were 1/2 feet OBSI~RVATION SPECIFICATION Yes No NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Iniection to refusal at each location. X Comments: Reinjecting north side, one pass. Technician: K. White Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC. Inc. 403ss Started: 6:30 am Stopped: 3:00 pm (1) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. Insp. P~ This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written ap~ov Engineering, Inc. tul D. Smith, P.E. ~1 of HBC Engineering, Inc. ~B-22 ,. I BUILDING D ~B-21 B-20~ B-16' LAKESHORE DRIVE BUILDING BI ~ ,-e 11-~.,.~ 1t-2 3UILDING A NOTE : 110RINGLOCATIONS ARE APPROXIMATE BORING LOCATION DIAGRAM COPPELL BUSINESS CENTER II COPPELL TEXAS HBC Pro~ec! Nc., 42-232~-g7 4 0 1OO 200 FEET l ~ I APPROXIMATE SCALE Date, 10/31/g7