Northlake 635(3)-LR 971207WATER INJECTION OBSERVATION
Client No.:
Client:
Project:
Project No.:
Location:
Procedure:
52617000
Lincoln Property Company
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr.
43-2452-97
Building C
Report No.: 9726,
Date of Service: 12/05
General Contractor: Butl,
Injector:
On 12/07/97, a representative of HBC Engineering, Inc. observer
of water at this site. During the injection process, the following <
recorded:
Pass No.: 4th No. of Probe 4 Probe Length 1
4747 lrvin8 Boulevard, Suite 206
Dallas, Tcxa~ 75247
t79
/97
Construction
th Moore, Inc.
the injection of
bscrvations were
1/2 feet
OBSI~RVATION
SPECIFICATION Yes No NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments: Reinjecting north side, one pass.
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC. Inc.
403ss
Started: 6:30 am Stopped: 3:00 pm
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
P~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written ap~ov
Engineering, Inc.
tul D. Smith, P.E.
~1 of HBC Engineering, Inc.
~B-22
,. I
BUILDING D
~B-21
B-20~
B-16'
LAKESHORE DRIVE
BUILDING BI
~ ,-e 11-~.,.~
1t-2
3UILDING A
NOTE :
110RINGLOCATIONS ARE APPROXIMATE
BORING LOCATION DIAGRAM
COPPELL BUSINESS CENTER II
COPPELL TEXAS
HBC Pro~ec! Nc., 42-232~-g7
4
0 1OO 200 FEET
l ~ I
APPROXIMATE SCALE
Date, 10/31/g7