Northlake 635(3)-LR 971209WATER INJECTION OBSERVATION
Client No.:
Client:
Project:
Project No.:
Location:
Procedure:
52617000
Lincoln Property Company
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr.
43-2452-97
Building C
Report No.: 9726
Date of Service: 12/0(`
General Contractor: Butl¢
Injector: KcnE
On 12/09/97, a representative of HBC Engineering, Inc. observer
of water at this site. During the injection process, the following
recorded:
Pass No.: 4th No. of Probe 4 Probe Length
4747 Irvin8 Boulevm'd, Sui~ 206
Daltu, Texas 75247
551
,/97
Construction
:th Moore, Inc.
· the injection of
,bservations were
10 feet
OBS I~VoATION
SPECIFICATION Yes NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X -
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
403ss
Started: 7:00 ara Stopped: 6:30 pm
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
P
This repo~l is exclusively for the use of the chent indicated above and shall not be reproduced except in full without the written appro~
C Engineering, Inc.
aul D. Smith, P.E.
~1 or' HBC Engineering. Inc.
~B-22
BUILDING D
~B-7
BUILDING B
~) B-6 B-r,~
B-$
BUILDING
NOTE :
BORING LOCATIONS ARE APPROXIMATE
BORING LOCATION DIAGRAM
COPPELL BUSINESS CENTER fl
COPPELL. TEXAS
HBC Projec~, No., 42-232'~-97
B-lO
B -8~
o lOO 200 FEET
I
APPROXIMATE SCALE
Date 10'31