Loading...
Northlake 635(3)-LR 971213WATER INJECTION OBSERVATION Comments: Client No.: Client: Project: 52617000 Report No.: 972712 Lincoln Property Company Date of Service: 12/13~ Coppell Business Center II General Contractor: Butle~ Belt Line Rd. & Lakeshore Dr. Injector: Kenn¢ 43 -2452-97 Building A On 12/13/97, a representative of HBC Engineering, Inc. observed of water at this site. recorded: Project No.: Location: Procedum: During the injection process, the following o' Pass No.: 1st No. of Probe 4 Probe Length 4747 l~An$ Boulevard, Suite 206 Dalla~ T~ 75247 This report is exclusively for lhe use of the client indicated above and shall not be reproduced except in full withoul the written apfxov~ 403ss (1) City of Coppell/Bldg. Insp. (1) City of Coppell/Constr. Insp. Started: 6:30 am Stopped: 6:00 pm Report Distribution: (1) Lincoln Property Company (1) Butler Construction (1) O'Brien & Associates (1) AECC, Inc. Pi Technician:, K. White Engineering, Inc. Jul D. Smith, P.E. I of HBC Engineering, Inc. OBSE TION SPECIFICATION Yes NIA Surfactant added to each load. X Injection pressure 50 to 200 psi at manifold. X Injection downward in 18 inch intervals. X __ Total depth of injection was 10 feet. X Spacing of injection was 5 feet maximum. X Injection to refusal at each location. X l 0 feet the injection of >servations were 23 97 Construction =th Moore, Inc. ~ B-25 B-22 B-19 B-24 BUILDING D ~)B-21 LAKESHORE DRIVE B-16 BUILDING C B-IS B-14 ,CATIONS ARE APPROXIMATE BUILDING BORING LOCATION DIAGRAM COPPELL BUSINESS CENTER II COPPELL, TEXAS o 1 oo APPROXIMATE 200 FEET [ SCAL£ F_PO c.. 4.2-2.32".-9- Date. 10.,'3!/9T