Northlake 635(3)-LR 971216WATER INJECTION OBSERVATION
Client No.: 52617000 Report No.: 97272
Client: Lincoln Property Company Date of Service: 12/16~
Project: Coppell Business Center II General Contractor:Butlex
Belt Line Rd. & Lakeshore Dr. ~njector: Kenm
43 -2452-97
Building A
Project No.:
Location:
Procedure:
Comments:
On 12/16/97, a representative of HBC Engineering, Inc. observed
4747 Irving Bo~levanl. Suil~ 206
Dalla~ Texu 75247
37
97
Construction
:th Moore, Inc.
the injection of
of water at this site.
recorded:
During the injection process, the following o
Pass No.: 2nd No. of Probe 4 Probe Length
)servations were
10 feet
OBSE TION
SPECIFICATION Yes NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Injection to refusal at each location. X
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC. Inc.
Started: See Report #9727236
(1) City of Coppell/Bldg. lnsp.
(1) City of Coppell/Constr. Insp.
P
This report is exclusively f¢~ the use of the client indicated above and shall no~ be reproduced excep{ in fult without the written
403ss
C Engineering, Inc.
aul D. Smith, P.E.
M of HBC Engineering, inc.
C)¥0~ 3N1-11-138
Z
C~
!1