Northlake 635(3)-LR 971217WATER INJECTION OBSERVATION
Client No.:
Client:
Project:
Project No.:
Location:
52617000
Lincoln Property Company
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr.
43-2452-97
Building D
Procedure:
Report No.: 97272
Date of Service: 12/17
General Contractor: Butle]
Injector: Kenll~
On 12/17/97, a representative of HBC Engineering, Inc. observed
of water at this site. During the injection process, the following o
recorded:
Pass No.: 5th No. of Probe 4 Probe Length
4747 lrvln8 Boulevard, Suite 206
Dallas, Texa~ 75;147
36
'97
Construction
th Moore, Inc.
the injection of
bservations were
0 feet
Comments:
Technician: K. ~v~lite Started: 7:00 ~ Stopped: 5:30 pm
Report Distribution: I--~ C Engineering, Inc.
(1) Butler Constm~ion (1) City of CoppelFConstr. Insp.
(1) O'Bfien & Associates
(1)AECC. Inc. Pul . P.E.
/
~is re~ is exdmiveN for t~ u~ of the dmnt ~t~ ~ ~d s~ll ~ ~ r~ ~pt ~ MI ~ ~ ~ffi a~ ~ HBC E~, ~.
O SE TION
SPECIFICATION Yes NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X