Northlake 635(3)-LR 971217 (2)WATER INJECTION OBSERVATION
Client No.: 52617000 Report No.: 9727:
Client: Lincoln Property Company Date of Service: 12/1~
Project: Coppell Business Center II General Contractor: Butle]
Belt Line Rd. & Lakeshore Dr. Injector: Kenn,
43-2452-97
Building A
Project No.:
Location:
Procedure:
4747 Irvin8 Boulevard, Suite 206
Dallas, Texa~ 75247
On 12/17/97, a representative of HBC Engineering, Inc. observed
37
t97
Construction
th Moore, Inc.
the injection of
of water at this site.
recorded:
During the injection process, the following o
Pass No.: 2nd No. of Probe 4 Probe Length
bservations were
10 feet
OBSERVATION
SPECIFICATION Yes o NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X , /
1
Spacing of injection was 5 feet maximin. X /
1
In, jection to refusal at each location. X J
Comments:
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
403ss
Started: See Report #9727336
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.