Northlake 635(3)-LR 971218 (2)WATER INJECTION OBSERVATION
Client No.:
Client:
Project:
Project No.:
Location:
52617000
Lincoln Property Company
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr.
43-2452-97
Building D
Report No.: 9727~
Date of Service: 12/1:
General Contractor: Buff{
Injector: Kenn,
4747 Irvin8 Boulevmd. Suite 206
Dallas. Tex~ 75247
.47
t97
Construction
:th Moore, Inc.
Procedure:
On 12/18/97, a representative of HBC Engineering, Inc. observed
of water at this site.
recorded:
During the injection process, the following
Pass No.: 5th No. of Probe 4 Probe Length
the injection of
bservations were
10 feet
OBSE TION
SPECIFICATION Yes NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
In, iection to refusal at each location. X
Comments:
Technician: K. White
Started: 7:00 am Stopped: 5:30 pm
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
403ss
(1) City of Coppell/Constr. Insp.
P~ul D. Smith, P.E.
/
This report is exclusively for the use of the client indicated above and shall no~ be reproduced except in full without the written approval of HBC Engine~'ing. Inc.
E3-24
,~G D
B-23 ..
B-19 B-20
LAKESHORE DRIVE
3P'B-18 ~B-15 B_ 1 1~'~1
B-16
BUILDING C ~ B-~.'~
~ ~B-9
B-17 B-14 B-12
B-10
B-8
BUILDING B
~ B-4 ·
B-3
B-2
BUILDING A
NOTE : BORING LOCATIONS ARE APPROXIMATE
BORING LOCATION DIAGRAM
COPPELL BUSINESS CENTER II
COPPELL, TEXAS
;"iBC Pro.iec'. Nc:..
EPolZT ~o.
0
o~
z
,,_J
I.-
._1
1 O0 200 FEET
'
APPROXIMATE SCALE
Dale 10 '31/gT