Northlake 635(3)-LR 971220WATER INJECTION OBSERVATION
Client No.:
Client:
Project:
Project No.:
Location:
Procedure:
52617000
Lincoln Property Company
Coppell Business Center II
Belt Line Rd. & Lakeshore Dr.
43-2452-97
Building D
Report No.: 97275
Date of Service: 12/20~
General Contractor: Butle!
Injector: KeIID¢
On 12/20/97, a representative of HBC Engineering, Inc. observed
of water at this site. During the injection process, the following ol
recorded:
Pass No.: 5th No. of Probe 4 Probe Length
4747 Iwin$ I~ule~atd, Suite ~06
Dallas, Texas 75247
69
97
Construction
th Moore, Inc.
the injection of
)servations were
l 0 feet
OBSERVATION
SPECIFICATION Yes o NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
Iniection to refusal at each location. X
Comments:
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
403ss
Started: 7:00 am Stopped: 5:00 pm
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
P;
This report is exclusively for the use of the cfient indicated above and shall not be reproduced except in full without Uae writte~ ap~'ov;
Engineering, Inc.
tul D. Smith, P.E.
~1 of HBC Engineering,
WATER INJECTION OBSERVATION
Project No.:
Location:
Client No.: 52617000 Report No.: 972T
Client: Lincoln Property Company Date of Service: 12/2~
Project: Coppell Business Center II Oen~ral Contractor: Buth
Belt Line Rd. & Lakeshore Dr. Injector: Kenn
43-2452-97
Building C
Procedure:
Comments:
On 12/20/97, a representative of HBC Engineering, Inc. observed
4747 Irving Boulevm*d, .~it~ 206
Dallas, Texas 75247
;7O
/97
: Construction
,~th Moore, Inc.
the injection of
of water at this site.
recorded:
During the injection process, the following e
Pass No.: 5th No. of Probe 4. Probe Length
bservations were
10 feet
OBS TION
SPECIFICATION Yes NIA
Surfactant added to each load. X
Injection pressure 50 to 200 psi at manifold. X
Injection downward in 18 inch intervals. X
Total depth of injection was 10 feet. X
Spacing of injection was 5 feet maximum. X
In, iection to refusal at each location. X
Started: See Report #9727569
(1) City of Coppell/Bldg. Insp.
(1) City of Coppell/Constr. Insp.
Technician: K. White
Report Distribution:
(1) Lincoln Property Company
(1) Butler Construction
(1) O'Brien & Associates
(1) AECC, Inc.
P;
This mi)oft is exclusively f~ the use of the client indicated above and sttall nol be relxoduced excedl in full v/ilhout the w~tten aplxov
403ss
~ Engineering, Inc.
tul D. Smith, P.E.
d of HBC Engineedn~ Inc.