Loading...
Northlake 635(3)-LR 971224 iN-PLACE DENSITY T' STING Date of Service: Client No.: Client: Services: 12/13/1997 52617000 Lincoln Property Company 3300 Lincoln Plaza/Larry Moon 500 North Akard Street Dallas TX 75201-3394 In-place density testing. CONTRACTOR: Butler Construction MOISTURE DENSITY RELATIONS: M/D No. Description 1 Med brn silty clay w/organics TEST NO TEST LOCATION 153 154 155 156 157 158 159 160 161 162 163 164 Building A NE corner. 60' NE corner. 60' NE corner. 60' NE corner. 60' NE corner. 60' NE corner, 60' NE corner. 60' NE corner. 60' NE corner. 60' NE corner. 60' NE corner. 60' NE corner. 60' Report No.: 9727016 Project No.: 43-2452. Project: Coppell Belt Lin, Coppell, 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 PROJECT DATA Laboratory Test Method: Field Test Method: ASTM ASTM ASTM Maximum Moisture % Density p.cf 23.5 99.0 Op FIELD DENSITY TESTS M/D MOISTURE No. (%) .97 Report Date 12/24/1997 Business Center II ~ Rd. & Lakeshore Dr. Texas D-698 D-2922 D-3017 Project Requirements west and 60' south, Final lift west and 61' south, 2nd lift west and 63' south, 1st lift west and 120' south, 3rd lift west and 121' south, 2nd lift west and 122' south, 1st lift west and 180' south, 3rd lift west and 180' south, 2nd lift west and 181' south, 1st lift west and 240' south, 3rd lift west and 241' south, 2nd lift west and 242' south, I st lift 1 24.1 1 23.9 I 24.0 1 24.6 1 24.3 1 23.9 1 23.6 1 24.1 1 24.2 1 24.2 I 24.0 1 24.1 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril Moisture or above DRY DENSITY (pcO Density 95% DENSITY (% max) 94.9 96 94.2 95 94.4 95 94.7 96 95.0 96 95.2 96 94.3 95 94.4 95 94.3 95 94.5 96 94.7 96 95.1 96 :n approval of HBC Engineering, Inc. 0755 Page I of 2 Report No.: 9727016 TEST NO 165 NE ! 66 N E corner, 167 NE corner, ! 68 N E corner, 169 N E corner, 170 NE corner, i 71 NE corner, 172 NE corner, ! 73 NE corner, 174 NE corner, 175 NE corner, 176 NE corner, 177 NE corner, 178 NE corner, 179 NE comer, 180 NE corner 181 NE corner 182 NE corner 183 NE corner 184 N E corner 185 NE corner 186 NE corner 187 NE corner 188 NE corner 189 NE corner 190 NE corner 191 NE corner TEST LOCATION corner, 60' west and 300' south 3rd lift 2nd lift 1st lift 3rd lift M/D MOISTURE No. (%) 60' west and 301' south 60' west and 303' south 60' west and 360' south 60' west and 361' south 60' west and 363' south 60' west and 410' south 60' west and 411' south 2nd lift 1st lift 3rd lift 2nd lift 60' west and 415' south, 1st lift 120' west and 420' south, 3rd lift 120' west and 418' south, 2nd lift 120' west and 415' south, 1st lift 120' west and 350' south, 3rd lift 120' west and 349' south, 2nd lift 120' west and 345' south, 1st lift 120' west and 290' south, 3rd lift 120' west and 287' south, 2nd lift 120' west and 285' south, 1st lift 120' west and 190' south, 3rd lift 120' west and 185' south, 2nd lift 120' west and 183' south, 1st lift 120' west and 10ft south, 3rd lift 120' west and 95' south, 2nd lift 120' west and 93' south, 1st lift 120' west and 20' south, 3rd lift 120' west and 15' south, 2nd lift 120' west and 10' south, 1 st lift 1 23.9 I 23.7 1 24.4 1 24.1 23.9 I 24.1 1 24.3 1 24.2 1 24.6 I 23.7 1 24.1 1 24.4 1 24.1 1 24.6 1 25.1 I 24.9 1 24.6 1 25.0 I 24.3 1 24.1 1 24.6 1 23.9 1 24.1 1 24.4 1 23.5 1 24.1 1 24.3 Test results on this report meet project specification. DRY DENSITY (pc0 DENSITY (% max) 94.7 96 94.1 95 94.4 95 95.0 96 94.7 96 94.8 96 94.9 96 94.2 95 94.3 95 94.9 96 94.6 96 94.7 96 94.9 96 95.1 96 94.6 96 94.2 95 94.1 95 94.9 96 94.3 95 94.6 96 95.1 96 95.0 96 94.9 96 94.7 96 94.4 95 94.5 96 94.6 96 Technician: Tex King Report Distribution: (I) Lincoln Property Company (I) Butler Construction (I) O'Brien & Associa£es (I) AECC, Inc. I"l~ .~ng, Inc. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wril P~ ul D. Smith, P.E. Se ~ior Project Engineer ten approval of ItBC Engineering, Inc. 07SS Page 2 of 2